Laserfiche WebLink
South Platte Decision Support System Groundwater Component Task 33 Field Study Work Plan <br />for Alluvial and Bedrock Well Installation, Testing, and Water Level Monitoring <br />SEO 2000. Rules and Regulations for Water Well Construction, Pump Installation, and <br />Monitoring and Observation Hole/Well Construction (Water Well Construction <br />Rules), 2 CCR 402-2, Effective June 1, 2000. Office of the State Engineer (Colorado), <br />State Board of Examiners of Water Well Construction, June 2000. <br />Theis, C.V. 1935. The Lowering of the Piezometer Surface and the Rate and Discharge <br />of a Well using Ground-water Surface. Transactions, American Geophysical Union. <br />16:519 524. <br />Wolfe, Dick, 2003. Personal communication to Andy Horn, August 21, 2003. <br />~. ~.1 l <br />22 <br />Z:\SPDSS\10-CDM DELIVERABLES\PHASE 2 FIELD WORKPLAN\FINAL DRAFT\FINAL SPDSS TASK 33 2 WORK PLAN.DOC <br />