My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task96-2-3_RiverNetwork_20050310
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task96-2-3_RiverNetwork_20050310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 10:04:46 AM
Creation date
6/6/2008 10:34:42 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 96.2 & 96.3 - River Network and Key Structures Location Products
Description
This subtask includes the following: Create a linked river network layer using the procedure proposed in Deliverable 96.1. Locate and integrate into the network SPDSS key diversion structures. Deliverable 96.2 is the river network and deliverable 96.3 is the location of the key structures along the network reaches.
Decision Support - Doc Type
Task Memorandum
Date
3/10/2005
DSS Category
GIS
DSS
South Platte
Basin
South Platte
Contract/PO #
C153960
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Riverside Technology inc.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 1. Task 96 Deliverables <br />Deliverable 96.2 96.3 <br />Filename SPDSS_NHD.mdb (100k) <br />Eastern_Slope.mdb (24k) DiversionLoc100k.dbf <br />DiversionLoc24k.dbf <br />Description NHD Geodatabases Tables linking diversion structures to NHD reaches <br />3. Comments and Concerns <br />High resolution (1:24K scale) NHD is currently available for all of the subbasins in the SPDSS study area <br />except one, the Upper North Platte (10180002) on the Colorado-Wyoming border. Only a very small <br />portion of the subbasin is within Colorado; however, there are three key diversion structures in this <br />subbasin. When the subbasin is completed RTi will update the DiversionLoc24k.dbf to include the <br />remaining three structures. <br />Page 2 of 2Riverside Technafogy, lnc. <br />Wnfcr Resuarecs Err~rncering and CuasrnNng <br />
The URL can be used to link to this page
Your browser does not support the video tag.