My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CRDSS_Task1_09-1_UserDatabaseYear1Summary
CWCB
>
Decision Support Systems
>
DayForward
>
CRDSS_Task1_09-1_UserDatabaseYear1Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2011 10:18:51 AM
Creation date
6/2/2008 9:22:07 AM
Metadata
Fields
Template:
Decision Support Systems
Title
CRDSS Task 1.09-1 - User Database - User Database Year 1 Summary
Description
The purpose of this task memorandum is to document the user database task activities performed during Year 1.
Decision Support - Doc Type
Task Memorandum
Date
5/10/1994
DSS Category
HydroBase
DSS
Colorado River
Basin
Colorado Mainstem
Contract/PO #
C153658, C153727, C153752
Grant Type
Non-Reimbursable
Bill Number
SB92-87, HB93-1273, SB94-029, HB95-1155, SB96-153, HB97-008
Prepared By
Riverside Technology inc.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Figure 1. <br />User Database Data Entry and Display Screen <br />3.A task memorandum describing and summarizing Task 1.09 activities and results. <br />In addition to this task memorandum, additional documentation on the database and database activities <br />has been produced. This information includes a revised CRDSS Database Design Document , the CRDSS <br />Users? Manual, and the CRDSS Developers? Manual. <br />3.0 CONCLUSIONS AND RECOMMENDATIONS <br />The following recommendations are made for consideration in the Phase IIb scoping process: <br />1. Add a database maintenance task to the Phase IIb scope. As part of this task, add a subtask to <br />maintain the user database. Allocate a man day at the beginning of the phase to bring the database <br />up to date and another man day near the end of the phase to update it again. <br />2. The current displays are adequate for use of the consultant team. As part of the scoping process at <br />the beginning of Phase IIb, examine whether additional capability needs to be added to this database <br />and associated utilities. <br />2 <br />A275 01.09.95 1.09-1 Greer, Ritsch <br />
The URL can be used to link to this page
Your browser does not support the video tag.