My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CRDSS_Task1_05-32_DesignAndImplementationYear1Summary
CWCB
>
Decision Support Systems
>
DayForward
>
CRDSS_Task1_05-32_DesignAndImplementationYear1Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2011 10:18:52 AM
Creation date
5/30/2008 3:48:34 PM
Metadata
Fields
Template:
Decision Support Systems
Title
CRDSS Task 1.05-32 - Study of System Integration Issues Design and Implementation Coordination Year 1 Summary
Description
The following issues are addressed in this memorandum: 1)Have the work products defined in the scope of work been completed? 2)What decisions were made in coordinating system development and system integration? 3) Do any concerns about system integration exist for Year 2 of the project?
Decision Support - Doc Type
Task Memorandum
Date
1/9/1995
DSS Category
DMI Utilities
DSS
Colorado River
Basin
Colorado Mainstem
Contract/PO #
C153658, C153727, C153752
Grant Type
Non-Reimbursable
Bill Number
SB92-87, HB93-1273, SB94-029, HB95-1155, SB96-153, HB97-008
Prepared By
Riverside Technology inc.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.0 CONCLUSIONS AND RECOMMENDATIONS <br />The following conclusions and recommendations are made regarding documentation for the CRDSS <br />database: <br />The work products as defined in the scope of work have in general been completed according to <br />? <br />the scope of work. <br /> <br />Additional work in Year 2 is necessary to ensure that all GUI programs have similar ?look and <br />? <br />feel?. Currently, some of the fonts and colors are inconsistent (although many other features <br />are similar). <br /> <br />As the role of PC access to the CRDSS is better defined, efforts to port some of the CRDSS <br />? <br />software to PCs will define code that requires additional work to make it portable. <br /> <br />crdss crdssgui <br />The use of a single entry point to the system (the and programs) is an effective <br />? <br />and efficient way to present the system to users. <br />Existing tools (as developed in Year 1) will be modified superficially in Year 2 to give a more <br />? <br />consistent ?look and feel.? This is necessary because, although different developers have <br />followed the specifications set forth for Year 1, each developer does things slightly differently. <br />These differences have not been a high priority given other work tasks, but should be cleaned <br />up in Year 2. <br />5 <br />A275 .01.09.95 1.05-32. Malers <br />
The URL can be used to link to this page
Your browser does not support the video tag.