My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01778 (2)
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJC01778 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:41 AM
Creation date
5/12/2008 7:53:22 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153723
Contractor Name
Orchard Mesa Irrigation District
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
HB 95-1155
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Ci~? 1 ?'-, <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br /> <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone (303) 866-3441 <br />FAX (303) 866-4474 <br /> <br />. <br /> <br />Roy Romer <br />Governor <br /> <br />James S. Lochhead <br />Executive Director, DNR <br /> <br />March 3, 1995 <br /> <br />Daries C. Lile, P.E. <br />Director, eweB <br /> <br />Mr. James D. Rooks <br />Orchard Mesa Irrigation District <br />P.O. Box 356 <br />Palisade, CO 81526 <br /> <br />RE: <br /> <br />Rehabilitation of the Mutual Mesa Lateral <br />Initial Loan Approval <br /> <br />Dear Mr. Rooks, <br /> <br />Concerning your application for a loan from the Construction Fund, I am pleased to inform you <br />that the Colorado Water Conservation Board (CWCB) has decided to include your request for a <br />$1,000,000 loan to rehabilitate the District's Mutual Mesa Lateral in its recommendation to the <br />Colorado General Assembly. <br /> <br />The CWCB recommended a loan term of 30 years at an interest rate of 4% for this $1,000,000 <br />authorization. The CWCB also authorized your district to refinance its existing CWCB loan at <br />an interest rate of 5% for a term of 30 years, at its option. I have attached a copy of the updated <br />Board memo concerning the Orchard Mesa Irrigation District. Please refer to page 3 of that <br />memo and to the section "Action Taken by the CWCB, January 25, 1995". Your Construction <br />loan will be considered by the State General Assembly as part of the 1995 Construction Fund <br />Bill, with passage expected in May 1995. <br /> <br />The Board has given their initial approval subject to the following conditions: <br /> <br />a. A feasibility study with an updated engineering cost estimate to evaluate the technical <br />and financial feasibility of the project is required. This cost estimate must be <br />accompanied by the NRCS plans and specifications upon which it is based. You should <br />also include a written discussion of the alternati ves the Company has considered, and state <br />why the selected alternative was chosen. Mr. Bill Green of this office (303-866-3441) <br />can provide assistance and guidance, and will ultimately be reviewing the cost estimate <br />and written discussion of alternatives. <br />
The URL can be used to link to this page
Your browser does not support the video tag.