Laserfiche WebLink
<br />the location of all gauges within the target area. The project gauges at PLH and MP2 were <br />moved to ING (lVlt. Ingalls) and BAG (Bagley Pass), respectively, prior to the 1993-94 wint.er <br />season to obtain better measurements of precipitation within the target area. <br /> <br />Table 2.3.- Precipitation gauge locations. <br /> <br />Station <br />Kame <br /> <br />3- Letter DCP ID Transit Data Elev. Lat. L-ong. <br />ID Time Avg. lm, (N) ,Wi <br /> (mini Int. {min; <br />PLS 34244708 33 15 1575 39.77< 120.70c <br />BHL 342449DA 34 15 1692 39.830 120.71" <br />JCC 3424547E 35 15 1951 39.86" 120.63" <br />WLL 34245AAC 36 15 1966 39.85" 120.53" <br />BO~ 342461E4 37 15 1585 39.81 c 120.64" <br />Pl\IP 34247292 39 15 1783 39.82" 120.58" <br />PLH 34247C40 40 15 1646 39.73" 120.52" <br />::I.IP2 34248216 41 15 1707 39.71c 120.58< <br />AGR 34249160 43 15 2122 39.96" 120.76" <br />BAG 1963 39.94" 120.55" <br />I:\"G 2243 39.96< 120.62" <br /> <br />Project Gauges <br /> <br />Plumas Eureka <br />Big Hill <br />Jackson Creek <br />Willow Creek <br />Bonta Ridge <br />Penman Peak <br />Pilot Hill <br />Mills Peak 2 <br />Argentine Rock <br />Bagley Pass <br />1\It. Ingalls <br /> <br />DWR Gauges <br /> <br />Gold Lake <br />Grizzly Ridge <br />Lake Da'l.is <br />Pilot Peak <br /> <br />GOL 2058 39.670 120.620 <br />GRZ 2104 39.92" 120.65" <br />DAY 1759 39.88" 120.47" <br />PLP 2073 39.79" 120.87" <br /> <br />c-r' <br />C- j ! <br />The nine project gauges were fully automated weighing gauges (2.2-kg load cell) with 12-in. <br />orifices. The catchcan was mounted on 11- or 14-ft standpipes and equipped with wind <br />screens. All gauges provide 0.25-mm resolution. Figure 2.7 shows the gauge site. <br /> <br />.=-----' <br /> <br />Using an auto siphon drain-and-fill system and an antifreeze recharge reservoir, the gauge <br />was automatically drained when full (requiring about 120 s to drain and fill) and was <br />recharged with a 20-pct glycerin, SO-pet denatured alcohol nonhazardous antifreeze. The <br />drain-and-fill cycle occurred when 50 to 135 rom (2 to 5 in.) of precipitation had accumulat.ed. <br />The exact amount depends on ambient air temperature. The antifreeze reservoir holds 10, <br />20, or 30 gal depending on the site. The antifreeze-precipitation mix-rure was drained <br />periodically into a waste reservoir. For those gauges ,\lith a 10-gal antifreeze reservoir, the <br />waste compartment would oyerflow after 20 in. of water equivalent precipitation had fallen. <br /> <br />The precipitation data were collected on site by a Handar 560A or 540 DCP (data collection <br />platform>. Precipitation data were collected at 15-min intervals and transmitted hourly via <br />the GOES satellite to the California Data Exchange Cent.er downlink in Sacramento and the <br />Reclamation downlink in Denver. Two existing DWR gauges were retrofitted with the same <br />load-cell technology as the nine project gauges. These sites are located at DA V (Lake Davis) <br />and GRZ fGrizzly Ridge!. <br /> <br />11 <br />