Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />XIII. ECONOMIC ANALYSIS <br /> <br />The economic benefit of the project is considerable as the continued operation of the irrigation wells <br />will significantly increase the value of the properties within the Lower Latham service area. <br /> <br />XlIII. SOCIAL AND PHYSICAL IMPACTS <br /> <br />The project will have no significant social impacts, since it will assure the continued operation of 84 <br />irrigation wells within the service area, resulting in the continuation of historical agricultural <br />operations. The project will have minor physical impacts as approximately 78 acres of historically <br />irrigated farm land that will be dried up and will not be irrigated with the subject shares after 2008. <br />LLRC has agreed to allow the subject shares to be utilized to establish native grasses during the 2008 <br />irrigation season, which will minimize adverse physical impacts. <br /> <br />XV. CONCLUSION <br /> <br />1. The LLRC is an incorporated entity in the State of Colorado with the ability to enter into <br />a contract with the CWCB for the purpose of obtaining a Construction Fund loan. <br />2. The project will provide augmentation water supply necessary to obtain and operate a <br />permanent plan for augmentation needed to allow uncurtailed pumping of irrigation wells <br />within the Lower Latham irrigation system. <br />3. The total estimated cost of the project is $737,817 and this will be financed, in part, by <br />standard commercial bank loan and by the CWCB Construction Fund. <br />4. The project is technically and financially feasible. <br /> <br />- 8 - <br />