My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150216 feas report
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150216 feas report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2010 8:53:38 AM
Creation date
4/27/2008 12:19:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150216
Contractor Name
Republican River Water Conservation District
Contract Type
Grant
Water District
0
County
Lincoln
Logan
Sedgwick
Washington
Yuma
Phillips
Kit Carson
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, <br />� • Other unforese�n �r unexpected costs. <br />� Th� tot�l atlowance for construction contingencies used in the feasibility cost estimates <br />is 10 Pereent of the BCS plus mobiliaation, bonds, and insurance. The sum of the BGS, <br />mobilization, bonds, and insurance, and construction contingencies is defined as the <br />' "Direct Construckion Subtotal" (DCS). <br />A"Total Estimated Projeet Cost," which is equal to the DCS plus allowances for design <br />� engineering (5 percent), permitting (2 pereent), owner I�gal and administrative costs (2 <br />percent), and construction administration and engin�ering (5 percent), is provided for <br />the preferred atternative. These costs include allow�nees for purchase of land or <br />' acquisition of Easemen#s required for project development or significant environmental <br />mitig�tian. <br />' The estimated Project co�ts pre�ented in this Loan Feasibility Study are based on <br />professional opinion of the cost to develop and construct the projec# as described in this <br />Study. The estimated costs are ba�ed on th� sQUrces of information described ab�ve, <br />� and knowleclge of curren# construetion cost conditions in the locality of the project. <br />A�tual project constru,c#ion �nd development cost� are affected by a numb�r of fa�tors <br />beyond the control of the RRWCD WAE and its engineering consultants, such as supply <br />e and demand for the types of construction required at the time of bidding and in the <br />� project vicinity; changes in materi�l supplier �osts; changes in lak�r rates; th� <br />eompetitiveness of contractors and suppliers; ehanges in applicable regulatory <br />' requirements; changes in design standards; and environment�l mitig�tion requirements <br />and other conditions ofi project permitting. Therefore, conditicros and factors that arise as <br />project development prc�ceeds through con�truction may result in proj�ct co�ts that <br />' differ from the e�timates documented in this L.oan Feasibility Study. <br />Table 4 contains sumrr»ries of the cost estimates develaped for the preferr�d <br />� alt�mative for the Comp�ct Compliar�ce Pipeline. <br />� <br />i <br />� <br />1 <br />! <br />1 <br />� 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.