My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150216 feas report
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150216 feas report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2010 8:53:38 AM
Creation date
4/27/2008 12:19:31 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150216
Contractor Name
Republican River Water Conservation District
Contract Type
Grant
Water District
0
County
Lincoln
Logan
Sedgwick
Washington
Yuma
Phillips
Kit Carson
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br />, <br />r <br />1 <br />1 <br />r <br />' <br />, <br />� <br />' <br />1 <br />, <br />, <br />� <br />� <br />� <br />� <br />1 <br />� <br />alignment will be determined when negotiations for the acquisition of rights to <br />designated ground water have been completed. <br />Tw� lignments for the north-to-south pipeline were developed tp estimate costs, one <br />th�t' �ollowed existing county roads wherever possible and one that was deemed best <br />from the standpc�int of gravity delivery. Local interests also identified an alignment that <br />was viewed to b� optimal fram fihe perspective of I�nd owner ne�otiation efforts. The <br />nc�rth-to-sQUth �lignment for the preferrsd alt�rnative shown on Figur� � r�vas selected <br />as the basis for estimating costs. <br />A summary of the major facilities �ssoci�ted with the preferred �Iternative is provided <br />below and the locations of fiacilitie� are �hown on Figure 9. <br />T�ble 2: Summary of Major Facilitie� for the Preferred Alternative. <br />Preferred Altern�tive <br />North Well Fe1d <br />6 nevu 2U00 gpm wells <br />7920 feet of 18" pipe <br />5280 feet of 24" pipe <br />Conveyance Pipeline <br />67 fe9t of 36" pipe <br />5tora�e Tank —1 M.G <br />River Outl4t Structure <br />The preferred alternative for the Compact Compliance Pipeline is �hown schematically <br />in plan and profile on Figure 2. Approximately 10,000 aeres of land irrigated by rights to <br />designated ground water will be retired and the his#orical consumptive use, estimated to <br />be 15,OQ0 acre-f�et per year, will be transferred from existing wells to si�c or eight new <br />wells. The proposed location of thes� new wells is shown on Figure 2. WitM a pumping <br />capacity of 2,QOQ gpm per well, six new wells will t� �ble to deliver 15,000 aer�-feet in � <br />nine-month period. The current schedule envisions c�mpletion of the wells and the <br />pipeline in early July 20Q9, with the poteantial to deliver a major portion o# Cvlorado's <br />estim�fi�d 2009 compact obligation (11,00� acre-f�et) before year-er�d 2009. <br />Wa#�r pumped from the individual wells wi11 be coll�ct�d in an interconnec#ed system of <br />pipeiines and then conveyed to a storag� tank locat�d at etevation 3��5. T'he storage <br />tank w71 provi�iE resenre �apacity �Ilowin,g the main pipeline to Qperate for 2 hours at <br />two-thirds c�pacity witM no inflaw to fiM� tank from fihe well field. The storage tank will <br />�I�o pro�ide protection of the rnain pipeline ftom surge and neg�#ive pr�ssures th�t <br />could develop if the main pip�line were eonnected directly ta the well field coflecfiion <br />system. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.