My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00576
CWCB
>
Weather Modification
>
DayForward
>
WMOD00576
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:41:06 PM
Creation date
4/24/2008 2:57:44 PM
Metadata
Fields
Template:
Weather Modification
Title
Summary of Weather Modification Activities Reported in 1979
Date
7/1/1980
Weather Modification - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />APPENDIX C-2 <br /> <br />INSTRUCTIONS FOR INTERIM AND FINAL REPORTS <br /> <br />Any person engaged in any weather modification project or activity in the United States on January 1 in any <br />year shall submit one copy of this form setting forth as of such date the information required with respect to <br />each such continuing project or activity not previously furnished in a prior interim report. The box indicating <br />"Interim Report" should be checked. The January 1 date shall not apply if other arrangements have previously <br />been made with the written approval of the Administrator of NOAA. The report shall be received by NOAA <br />not later than 45 days following the end of the reported period. <br /> <br />Upon completion of a project or activity one copy of this report shal,1 be submitted and the box checked <br />indicating "Final Report." The final report shall be received by NOAA not later than 45 days after the <br />completion of the project or activity. <br /> <br />.~ ' <br /> <br />~ <br /> <br />The NOAA File Number should be filled in for any project for which the Administrator has assigned a file <br />number. <br /> <br />A supplemental report in letter form referring to the appropriate NOAA file number must be made to the <br />Administrator if the "Interim" or "Final" reports are found to contain any material inaccuracies, <br />misstatements, and omissions. <br /> <br />INTERIM REPORT <br /> <br />The information in Items (a) through (e) on the report form should be provided as prescribed below for the <br />months to which the report pertains. If no data are applicable for any given item in any month, enter zero. <br /> <br />Item (a). Enter number of days on which actual weather modification activities took place. <br /> <br />Item (b). Enter in the appropriate column number of days on which modification activities were conducted, <br />segregated by each of the major purposes of the activities. Normally, the total of entries in (b) <br />would equal total in (a). <br /> <br />Item (c). Enter number of modification missions that were carried out. <br /> <br />. Item (d). Enter in the appropriate column total number of hours of operation of each type of weather <br />modification apparatus, (i.e., net hours of agent release). If the form does not contain sufficient <br />space, report additional types on a separate sheet. <br /> <br />Item (e). Enter in the appropriate column total amount of agent used, by type. If the form does not contain <br />sufficient space, report additional types on a separate sheet. <br /> <br />The totals for these items shall be provided for the period covered by the interim report. <br /> <br />FINAL REPORT <br /> <br />The final report shall contain the information required for interim reports, to the extent not previously <br />reported. In addition, the items designated as "Totals for Final Report" should be reported. This information <br />should pertain to the entire project or activity period, rather than only the period since the last interim report. <br />At the space at the end of the form, enter the date on which final weather modification activity occurred. <br /> <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.