Laserfiche WebLink
<br />Sec. <br />908.10 Penalties. <br />908.11 Maintenance of recorda of related <br />actIvIties. <br />908,12 Publ1c dlsclOllure ot Information. <br />908,13 Addl'eflS ot Jetterll. <br />908.14 Bu81ness to be transaeted In writing. <br />908.15 TImes tor tak1ng action: expiration <br />on Saturday, Sunday, or hOllclllY. <br />908.16 Signature. <br />908.17 Suspension or walver of rules. <br />908,18 Matters not specifically provided tor <br />In rules. <br />908,19 Publication of notice of proposed <br />amendmenhl. <br />908.20 Effective date. <br />908,21 Report form. <br />AUTHORITY: Pub, L. 92-306. 85 Stat, 735. <br />December 18, 1971. <br /> <br />S 908.1 Definitions. <br /> <br />As used in this part, terms shall have <br />the meaning ascribed in this section. <br />(a) Administrator. The Administrator <br />of the National Oceanic and Atmospheric <br />Administration. ' <br />(b) Person. Any individual, corpora- <br />tion. company; association, firm. partner- <br />ship, society, joint stock company. any <br />State or local government or any agency <br />thereof, or any other organization. <br />whether commercial or nonprofit. except <br />where acting solely as an employee. <br />agent, or independent contractor of the <br />Federal Government. <br />(c) Weather modification activity. <br />Any activity ~rfonned with the inten- <br />tion of producing artificial changes in <br />the composition, behavior, or dynamics <br />of the atmosphere. <br />(d) United states. The several states, <br />the District of Columbia. the Common- <br />wealth of Puerto Rico. and any territory <br />or Insular possession of the United <br />states. <br />(e) Persons whose acti!1ities relate to <br />weather modification. Persons engaged <br />In weather modification activities or en- <br />gaged in the distribution or sale of <br />weather modification apparatus or ma- <br />terials known by them to be destined for <br />use in weather modification activities. <br />(f) Proiect. A related series of weather <br />modification activities having a common <br />objective. <br />(g) Modification mission. One or more <br />airborne weather modification activities <br />intended to affect the same ~et area., <br />or one ot' more weather modification <br />activities carried out bv Items of ground- <br />based weather modification apparatus <br />intended to affect the same target area. <br />For purposes of these rules, activities <br />that extend beyond 1 calendar day shall <br />constitute a separate mission for each <br />day that they continue. ' <br />(h) Target area. The ground area <br />within which the effects of the weather <br />modification activity are expected to be <br />found. <br />(j) Control area. A preselected. un- <br />treated ground area.used for comparison <br />with a target area. <br />(j) Weather modification apparatus. <br /> <br />APPENDIX B <br />lUllS AND IEGULAnONS <br /> <br />Any apparatus used with the intention of <br />producing artiflclal changes in the com- <br />posJt1on, behavior, or dynamics of the <br />atmosphere. For example: Seeding gen- <br />erators, propane devices, fiares; rockets, <br />art1llery prOjectiles. jet engines, etc.' <br />(k) Sponsor. The primary person for <br />whom the weather modification activity <br />Is performed. <br />(I) Operator. The person"who Is pri- <br />marilY responsible for carrying out the <br />weather modification activity. <br /> <br />fl 908.2 Persons 8ubje<<:t to reporting. <br /> <br />Any person engaged or intending to <br />engage in any weather modification <br />activity In the United States shall be <br />subject to the reporting provisions of <br />this part. <br /> <br />~ 908.3 Activities subject to reporting. <br /> <br />(a) The following, when conducted as <br />weather modification activities, shall be <br />subject to reporting: <br />(1) Seeding or dispersing of any sub- <br />stance into clouds or fog, to alter d~op <br />size distribution. produce Ice crystals or <br />coagulation of droplets, alter the de- <br />velopment of hail or lightning, or influ- <br />ence in any way the natural development <br />cycle of clouds or their environment: <br />(2) Using fires or heat sources to in- <br />fluence convective circulation or to <br />evaporate fog; <br />(3) ModifYing the solar radiation ex- <br />change of the earth or clouds, through <br />the release of gases, dusts, liquids, or <br />aerosols into the atm06phere; <br />(4) ModifYing the characteristics of <br />land or water surfaces by dusting or <br />treating with powders, liquid sprays. <br />dyes. or other materials: <br />(5) Releasing electrically charged or <br />radioactive particles. or Ions. into the <br />atmosphere: <br />(6) Applying shock waves, sonic en- <br />ergy s~. or other explosive or acous- <br />tic sources to the atm06phere: <br />'(7) Using aircraft propeller down- <br />wash, jet wash. or other sources of arti- <br />ficlal wind generation; or <br />(8) Using lasers or other sources of <br />electromagnetic radiation. <br />(b) In addition to ,the activities llsted <br />above, other similar activities faIling <br />within the definition of weather modi- <br />fication as set forth in I 908.1 are also <br />subject to repOrting. <br />(c) The requirement for reporting <br />shall not apply to activities of a purely <br />local nature that can reasonably be ex- <br />peCted not to modify the weather outside <br />of the area of operation. This exception <br />is presently restricted to the use of light- <br />ning deflection or static discharge deVices <br />in aircraft. beats, or buildings. and to the <br />use of small heat sources. fans. fogging <br />devices, aircraft downwash, or sprays to <br />prevent the occurrence of frost in tracts <br />or fields planted with crops susceptible <br />to frost or freeze damage, Also expected <br />from the requir€1I1ent for reporting are <br />religious activities or other ceremonies, <br /> <br />20 <br /> <br />rites and rituals Intended to modify the <br />weather. <br />(d) All activities noted in II 908.3(a) <br />and (b) are subject to initial reporting. <br />However. after the Administrator has <br />received initial notification of a planned <br />activity, he may waive some o-f the sub- <br />sequent reporting requirements. This <br />decision to waive certain reporting re- <br />quirements will be based on the general <br />acceptib1lity, from a technical or scien- <br />tific viewpoint, of the apparatus and <br />techn1('lues to be used. <br />(e) other reporting 'Exceptions may <br />be made in the future by rule of the <br />Administrator. <br /> <br />S 908.4 Initial ~eport. <br /> <br />(a) Any person intending to engage In <br />any weather modification project or ac- <br />tivity in the United States shall prOVide <br />a report of his intention, to be received <br />by the Adminlskator at least 10 days <br />before the commencement of such- proj- <br />ect or activity. This report shall contain <br />at least the following: <br />(1) The designation, if any, used by <br />the operator for the project or activity; <br />(2) The follOWing dates for' weather <br />modlflcation activities: <br />(i) The date the first actual weather <br />modification activity is to be undertaken; <br />(Ii) The date on which the final modi- <br />fication activity is expected to occur: <br />(3) The following Information on per- <br />sons Involved with the project or <br />activity: <br />(1) The, name. amIlation, and address <br />of the sponsor; <br />(Ii) The name, amllation, and address <br />ot the operator; <br />(4) The purpose of the projeCt or ac- <br />tivity; , <br />(5) A map showing the approximate <br />size and location of the target and con- <br />trol areas, and the location of each item <br />of ground-based weather modification <br />apparatus, precipitation measuring de- <br />vice. and. for airborne operations. the <br />airport : <br />(6) A descrlptlon of the weather modi- <br />f1catlon apparatus. modification agents, <br />and the techniques to be employed: <br />(7) The name and addre.,s of the re- <br />sponsible individual from whom log books <br />or other records of the project or actiVity <br />may be obtained; <br />(8) Answers to the follOWing questions <br />on project safeguards: <br />(1) Has an Environmental Impact <br />Statement. Federal or State, been filed: <br />Yes ____ No ____. U Yes. please ,furnish <br />a copy as applicable. <br />(11) Have provisions been made to ac- <br />quire the latest forecasts. advisories, <br />warnings. etc. of the National Weather <br />Service. Forest Service, or others when <br />issued prior to and during operations? <br />Yes ____ No ____. U Yes, please specify <br />on a separate sheet. <br /><111> Have any safety procedures (op- <br />erational constraints, provisions for sus- <br />pension of operations. monitoring meth- <br />