Laserfiche WebLink
<br />- _. ..........~ ~.._........"-= -'-..... ....--~...-..--.....,. ---",-,,--,-,.. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />2.9.2 YEAR TWO BUDGET <br /> <br />llEM <br /> <br />SYSTEMS CAPITALIZATION <br />Doppler radar and data acquisition system <br />automatic ground-based AgI generators (2) <br />meteorological data collection platforms (3) <br /> <br />SYSTEMS INSTALLATION AND TESTING <br />radiosonde (1 site) <br />field transportation (surface and airborne) <br />site development (5 remote sites) <br /> <br />FIELD OPERATIONS (one month of seeding trials) <br />mountain observatory (6 months) <br />research aircraft (contract) <br />seeder aircraft (contract) <br />SF6 tracer studies (contract) <br />ground generator operations <br />upper air (1 site) <br />forecast office <br />field subsistence <br /> <br />MANPOWER <br />professional/technical <br />overhead <br />support studies <br />reports <br /> <br />services <br />(@ 60 percent) <br />(contracts) <br /> <br />TOTAL <br /> <br />2-19 <br /> <br />. <br /> <br /> kQll <br />$ 300 000 <br />$ 60 000 <br />$ 90 000 <br />$ 30 000 <br />$ 40 000 <br />$ 50 000 <br />$ 50 000 <br />$ 100 000 <br />$ 25 000 <br />$ 40 000 <br />$ 10 000 <br />$ 20 000 <br />$ 25 000 <br />$ ~~O 000 <br />$ 520 000 <br />$ 312 000 <br />$ 100 000 <br />$ 8 000 <br />----------- <br />$ 1 800 000 <br />