Laserfiche WebLink
<br />SECTION 7. - GROUND PMS 2D-C <br /> <br />The PMS 2D-C operated in past wi nters by SCPP was on Grand Mesa from E!arly <br />November to early January. Duri ng November it was mostly inoperative because of <br />shorting by a stray wire inside the probe. Thereafter it was operated at the <br />radar-radiometer site during precipitation events, often during aircraft opera- <br />tions. Formvar slides and snowboard measurements were usually made at the same <br />time. Table 7-1 lists the periods of data obtained. <br /> <br />7-1 <br />