My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00556
CWCB
>
Weather Modification
>
DayForward
>
WMOD00556
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:40:47 PM
Creation date
4/24/2008 2:55:24 PM
Metadata
Fields
Template:
Weather Modification
Title
A Simulation of the Costs of Removing Snow from County Highways in Colorado
Date
3/1/1983
Weather Modification - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Collection of Data for the Model <br /> <br />Data for the model were gathered by interviewing the foremen who <br />direct snow reIOOval operations in each county. The foremen were asked <br />to descr ibe: <br /> <br />1. What resources are available-.-including personnel and their <br />rates of pay, equipment; and <br /> <br />2. How resources are typically used when it snows--including the <br />minimum amount of snow requiring reIOOval, the time and <br />equipment required to reIOOve various amounts, the time <br />required for mop-up (pushing back banks, clearing drifts and <br />sanding slick spots on days following storms) and policies <br />for overtime. <br /> <br />Foremen reported that the time required to remove given amounts of <br />snow depends on characteristics of storms such as wind, density of snow, <br />time of day and duration. These characteristics are discussed below. <br />We developed methods to account for time of day and duration. Wind and <br />density of snow were accounted for by asking foremen to "abstract away" <br />the extreme and consider typical conditions. Foremen were asked to <br />identify and discuss special problems (like those caused by extreme <br />wind) before we asked them to estimate the time required to remove given <br />amounts of snow under typical conditions. <br /> <br />Foremen reported that amounts of snow from a given storm could <br />vary considerably within their districts. This was especially true in <br />mountainous distr icts where snow depth varies with elevation and the <br />angle of the wind to nearby mountain barriers. Most foremen could, <br />however, identify a pattern of variation: ''When we get three inches <br />here at the shop, six or eight usually fall on the ridge." Although the <br />reported pattern did not apply to all storms, we asked them to consider <br />it when indicating how employees and equipment are deployed. <br /> <br />-7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.