My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00512
CWCB
>
Weather Modification
>
DayForward
>
WMOD00512
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:40:29 PM
Creation date
4/24/2008 2:49:34 PM
Metadata
Fields
Template:
Weather Modification
Title
Special Report to the Commissioner - Precipitation Management for the Colorado River Basin
Date
1/1/1980
State
CO
Country
United States
Weather Modification - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SECTION V. THE SMO JUAN OPERATIONAL PROGRAM <br /> <br />Introduction <br /> <br />The proposed San Juan Operational Cloud Seeding Project is a <br />3-phase effort that can lead to Basinuide operations by 1989. The <br />program schedule includes a I-year Initiation Phase to negotiate <br />contracts. obtain equipment. and make field installations; a <br />2-year Preoperational Phase to obtain field verification of the <br />operational procedures and modification hypotheses; and a 4- or <br />5-year Operational Phase beginning in the 1983-84 winter season <br />(FY 1984). A Basinuide precipitation management program could <br />then begin in the Colorado River Basin in 1989 if the significant <br />and required optional transferability studies are conducted in <br />parallel uith the San Juan operational program. Figure 4 shows <br />the San Juan design components. Figure 5 shows the operational area. <br /> <br />The San Juan program must include a strong emphasis on observation <br />of the intermediate processes within cloud systems. Understanding <br />of these intermediate processes is critical. so that program <br />scientists will be able to assess the results. regardless of <br />whether or not they are as expected. In addition. such an under- <br />standing is required to confidently transfer the techniques <br />developed in the San Juan area to other subbasins of the Colorado <br />River Basin and other areas of the West. <br /> <br />Basinwide precipitation management operations can be initiated in <br />1989 only if the transferability studies are conducted concurrently <br />with the San Juan operational program. The transferability studies <br />will collect and analyze relevant meteorological and topographic <br />data for each of the high-yield potential precipitation management <br />areas. Ground-based seeding feasibility studies to be conducted in <br />a second Colorado River subbasin are not a prerequisite to beginning <br />Basinwide operations by 1989; they are a highly desirable option to <br />determine the viability of this seeding mode in terms of efficiency <br />and cost effectiveness. These studies are discussed in detail in <br />the Parallel Studies subsection of this report. <br /> <br />The Initiation Phase <br /> <br />The I-year Initiation Phase (FY 1981) is scheduled as an intensive <br />period of equipment. facility. and operations contract procurement; <br />equipment installation; team building; and personnel training. A <br />project field office must be established and data collection from <br />newly-installed systems initiated. Environmental and social impact <br /> <br />V-l <br />
The URL can be used to link to this page
Your browser does not support the video tag.