Laserfiche WebLink
<br /> <br />Figure 7. Pagosa Springs Rawinsonde and Radar Site <br /> <br />3.3 Data Acquisition and Quality <br /> <br />Ice Crystal data were collected at every possible opportunity from <br /> <br />February, 1973 through March, 1975. Data were collected from a total of <br /> <br />22 storms, some lasting only an hour to some lasting more than 24 hours. <br /> <br />Of the 22 storms, seeding generators were operated during portions of ten <br /> <br />of the storms. The periods of generator operation during storms are <br /> <br />indicated in Figures DI-D22 (Appendix D) by a black and white dashed line. <br /> <br />Some of the ice crystal data were taken during times when the generators were <br /> <br />being turned on or off. The initial estimate of the transport time for the <br />-12- <br />