My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00446
CWCB
>
Weather Modification
>
DayForward
>
WMOD00446
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:39:20 PM
Creation date
4/18/2008 10:02:48 AM
Metadata
Fields
Template:
Weather Modification
Title
Utah Cloud Seeding Program - Increased Runoff/Cost Analyses
Date
2/1/2000
Weather Modification - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />5. Compute the estimated cost per acre-foot by dividing the project cost <br />by the increase in average annual runoff determined in 4 abovE~. <br /> <br />Cloud Seeding Project Areas and Operational Cost <br /> <br />Utah has four active cloud seeding project areas, as shown in Figure 1. The winter <br />storm systems in these areas are being seeded with ground-based generators using silver <br />iodide. The Central and Southern Utah Project (CSUP), comprised of the Central/Southern <br />Utah and the Tooele County project areas, is sponsored by the Utah Water Resources <br />Development Corporation. The Northern Utah Project (NUP), comprised of the West Box <br />Elder and the East Box Elder/Cache County project areas, is sponsored by the Bear River <br />Water Conservancy District and Cache County. North American Weather Consultants is <br />the contractor for each of these projects. <br /> <br />The estimated cost for the Northern Utah Project is $87,800 for the 1999-2000 <br />season. The estimated cost for the Central and Southern Utah Project is $166,500 for the <br />1999-2000 season. The total estimated cost for both projects is $254,300. For the 1999- <br />2000 season, the state, through the Division of Water Resources, is cost-sharing with the <br />local sponsors at 50 percent ($127,~50). <br /> <br />A verage Annual Runoff in the Cloud Seeding Project Areas <br /> <br />As part of the State Water Plan, the Utah Division of Water Resources has <br />published annual stream flow charts for the 1941-1990 period for most streams in the <br />state. The division has also published hydrologic inventories and water budget reports for <br />most areas of the state. Based on data from these reports, an estimate of the average <br />annual runoff for the 50-year 194.1--1990 period has been made for the cloud seeding <br />project runoff areas. A summary of the estimated annual runoff data is shown in Table 1. <br />The estimated runoff data for each runoff area in the project areas are tabulated in <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.