My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150069 Benefits & Potential Roles Report
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150069 Benefits & Potential Roles Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2010 1:46:45 PM
Creation date
4/17/2008 10:32:29 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150069
Contractor Name
Colorado State University
Contract Type
MOU
Water District
0
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />It <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />OUTDOOR WATER USE: <br /> <br />Regional standard is 100 gal. <br />per capita/day, but varies with <br />lot size, income, etc. <br /> <br />In brief... <br /> <br />Figure 23 <br /> <br /> <br />WATEIl...AtlEY <br />DE\lnOPllelll <br /> <br />~"AIl V'/DER <br />AO!tlCUl'VRlIl <br />PllODUCT>O'1 <br />(!/OC'H'''GEi <br /> <br />· Including pressurized, non-potable (secondary) water <br />supply systems into a canal company's existing <br />operation is simply 're-packaging' the product and <br />service that the company has historically provided. <br /> <br />Regional standard is 70 60000 <br />gal. per capita/day 40000 <br /> <br />INDOOR WATER USE: <br /> <br />In brief... <br /> <br />Figure 24 <br /> <br />120000 <br />100000 <br /> <br />80000 <br /> <br />1~lllllnl <br />I I I I I I I I I I I I I <br />I I I I I I I I I I I I I <br /> <br /> <br />20000 <br /> <br />o <br />Jan. Mar. May Jul. Sep. Nov. <br /> <br />· Teaming up with a viable secondary water supplier will <br />allow potable water providers to plan more effectively <br />for potable water needs, without worrying about the <br />variable needs of outdoor watering in the summer. <br /> <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.