My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02232
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02232
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 11:08:12 AM
Creation date
4/17/2008 10:17:26 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150258
Contractor Name
Lower Arkansas Water Management Association
Contract Type
Loan
Water District
67
County
Bent
Prowers
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction F�nd Loan Application <br />6. Will the acquisition of additional water rights be necessary? YES X�� NO <br />If YES, please explain. The nroposed project involves the acquisition of the remainin� one-half <br />of the Keesee Water Rights. For a more detailed exnlanation of the project see the attached <br />Feasibilitv StudX <br />7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and <br />attorney(s). <br />Randy L. Hendrix, P.E. Richard J. Mehren, Esq. <br />Helton & Williamsen, P.C. Moses, Wittemyer, Harrison and Woodruff, P.C. <br />384 Inverness Parkway, Suite 144 P. O. Box 1440 <br />Englewood, CO 80112 Boulder, CO 80306-1440 <br />(303) 792-2161 (303) 443-8782 <br />8. List any feasibility studies ar other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. See the attached Feasibilitv Study. <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, if laiown. <br />Estimated Engineering Costs: <br />Estimated Construction Costs: <br />Estimated Other Costs: <br />Estimated Total Costs: <br />10. Loan amount and terms you are requesting. <br />$ 50,000.00 <br />N/A <br />$_ 3,600,000.00 (land acquisirion, water rights purchase, etc.) <br />$ 3,650,000.00 <br />Requested Loan Amount: $ 2,493.722.00 (Usually 75-90 % of Fst. Total Costs) <br />Term (length) of loan: <br />30 years <br />(Usually 10, 20, or 30 years) <br />Interest Rate: <br />2.3% <br />Part C. - Project Sponsor F�nancial Information <br />(Please call for our current rates) <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following information is <br />needed to assist the CWCB in a preliminary assessment of the applicant's financial capacity. It is <br />also requested that the project sponsor submit with this application, copies of the three most recent <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.