Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />APPENDIX <br />TABLES <br /> <br />Table <br /> <br />A.1 Potential experimental locations with at least 20 km width, a substantial area <br />above 9000 ft elevation, and not primarily within a wilderness area. . . . . . <br />A.2 Rating factors or considerations for experimental site selection in approximate <br />order of importance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />B.1 Comparison of percent of days with measurable precipitation (left columns) and <br />percent of 25-year normal snow water equivalent (right columns) between <br />Grand Mesa and Wasatch Plateau SNOTEL sites ............. . . . <br />B.2 Storm duration, precipitation, and estimated SLW flux for three-winter programs <br />over the Tushar Mountains . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />B.3 Storm duration, precipitation, and estimated SLW flux for 16 Wasatch Plateau <br />storms from mid January to mid March 1991 . . . . . . . . . . . . . . . . . . . <br />B.4 Storm duration, precipitation, and estimated SLW flux for 65 Grand Mesa storms <br />from November to December 1983 and January to March 1985 . . . . <br />C.1 Listing of stream gauges and snow courses used in this study ..... <br />.C.2 Predicted percentage increases in seasonal runoff . . . . . . . . . . . . <br />D.1 Potentially affected resources that should be included in a CE checklist <br />D.2 Standard formats for EA and EIS . . . . . . . . . . . . . . . . . . . . . <br />D.3 Possible contact agencies to fulfil NEPA interagency cooperation requirements <br />D.4 Studies documenting effects of snowfall augmentation projects . . . . . . . . . <br />D.5 A comparison of the NEPA compliance process for CE, EA, and EIS . . . . . . <br />D.6 Cost estimates for the CREST environmental compliance scenarios in dollars . <br />D.7 Annual and total cost estimate for the CREST environmental monitoring . . . <br />E.1 Estimated program operating cost in 1993 dollars . . . . . . . . . . . . . . . . . . <br />E.2 Estimated program operating cost assuming a 4 percent annual escalation factor. <br />E.3 Estimated program labor ..... <br />E.4 Detailed cost and labor estimates . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> <br />APPENDIX <br />FIGURES <br /> <br />Figure <br />B.1 Storm precipitation vs supercooled liquid water flux for the Tushar <br /> <br />Mountains, UT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />B.2 Storm precipitation vs supercooled liquid water flux for the Wasatch Plateau, UT . <br />B.3 Storm precipitation vs supercooled liquid water flux for the Grand Mesa, CO . <br />C.1 April through July runoff at Seven Mile Creek, UT, vs April 1 snow water <br />equivalent at Farnsworth Lake, UT, snow pillow . . . . . . . . . . . . . . . . <br />C.2 April through July runoff at Pine Creek, WY, vs April 1 snow water equivalent <br />at Elkhart Park, WY, snow pillow ............. . . . . . . . . . <br />C.3 April through July runoff at East Fork of the San Juan River, CO, vs mean <br />April 1 snow water equivalent from three high elevation snow courses .. <br /> <br />X~ <br /> <br />... <br /> <br />Page <br /> <br />63 <br /> <br />68 <br /> <br />76 <br />79 <br />82 <br /> <br />85 <br />95 <br />96 <br />111 <br />112 <br />118 <br />124 <br />125 <br />128 <br />129 <br />140 <br />141 <br />142 <br />143 <br /> <br />81 <br />83 <br />86 <br /> <br />98 <br />99 <br />101 <br />