Laserfiche WebLink
<br /> Table II.3 Personnel Time Required for "PROBE' <br /> Preparation, Operation, and Termination <br /> Activities <br /> Title Vocation Function Consumed Time (Person-months) <br /> Preparation Operation Termination Total <br /> Site Manager Meteorologist Administration 5 3 2 10 <br /> Research Supervisor Meteorologist Data Handling Mgmt 6 3 3 12 <br /> Field Supervisor Meteorologist Equip. Preparation Mgmt 6 3 3 12 <br /> Electronics System Engineer Electronics Electronics Retrofit & Calib 6 3 3 12 <br /> Electronics Tech. Electronics Electronics Retrofit & Calib 6 3 2 11 <br /> Electronic Consultant Electronics Electronics Retrofit & Calib 2 3 0 5 <br /> Electronic Consultant Electronics Electronics Retrofit & Calib 2 3 0 5 <br /> Research Meteorologist Heteorologist Data Handling Preparation 6 3 1 10 <br />00 Programmer Analysts Computer Sci Data Handling Preparation 6 3 0 9 <br /> Research Aides Technician Instrument Calibration 6 3 3 12 <br /> Research Aides Technician Instrument Calibration 6 3 1 10 <br /> Office Hanager Clerical Clerical Management 3 2 1 6 <br /> Statistical Clerk Clerical Data Entry and Handling 6 3 3 12 <br /> Total 66 38 22 126 <br /> ~~.~- <br />