My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00408
CWCB
>
Weather Modification
>
DayForward
>
WMOD00408
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:38:29 PM
Creation date
4/16/2008 11:09:07 AM
Metadata
Fields
Template:
Weather Modification
Contract/Permit #
14-06-D-6963
Project Name
Colorado River Basin Pilot Project
Title
Colorado River Basin Pilot Project - Final Comprehensive Operations Report - 1970-75 Season
Date
12/23/1975
Weather Modification - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />days in the San Juan mountain region. However, only about 40 days were <br />expected to be suitable for increasing snowfall by seeding. The randomi- <br />zation in the seed plan called for seeding during half, or about 20, of the <br />suitable days. Even with seeding of only half the suitable storms, an average <br />precipitation increase of 16 percent in a typical year was expected (see Table <br />I-I). This amounts to about 3.8 inches of precipitation annually or about 30-40 <br />additional inches of snowfall. Increases in individual storms may reach from <br />50 to 100 percent. <br />In Subareas I and 2, the 16 percent increase due to Pilot Project seed- <br />ing was expected to yield an average of 250,000 acre-feet of additional stream- <br />flow annually. <br /> <br />~ <br /> <br />~ <br /> <br />::. <br /> <br />1-6 <br /> <br />6' <br />
The URL can be used to link to this page
Your browser does not support the video tag.