My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00390
CWCB
>
Weather Modification
>
DayForward
>
WMOD00390
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:37:25 PM
Creation date
4/16/2008 10:36:50 AM
Metadata
Fields
Template:
Weather Modification
Title
A Proposed Wintertime Weather Modification Research Program for Colorado
Date
1/1/1980
State
CO
Weather Modification - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />of from 9 to 18 hours. During a few prolonged periods, seeding <br />operations could continue uninterrupted for about 48 hours. In <br />some instances, marginally suitable seeding conditions could exist <br />interspersed with intermittent brief periods of forecasted <br />unfavorable conditions, which might endure from 6 to 12 hours. <br />When these circumstances occur, the same randomly-selected seed <br />or no-seed decision should be continued as long as a return to <br />suitable conditions occurs with less than 18 hours interruption. <br />If 18 or more hours elapse between seeding operations with inter- <br />vening unfavorable seeding conditions and with or without the <br />occurrence of observed precipitation, then a new random seeding <br />decision would be obtained. <br />In summary, a suitable seeding event that meets all the <br />seeding criterion set forth in Section IV.B.2.a, and can be seeded <br />by the means available in this program, must meet the following <br />operational criteria: <br />(1) The event must be six hours or more in duration. <br />(2) Operations that are temporarily shut-down for less than <br />18 hours shall resume with the same random seed or <br />no-seed decision that was in effect during the <br />initial portion of the operation, if seedable clouds <br />are again forecast or observed over the project area. <br />(3) A new seeding decision shall be declared if 18 or more <br />hours elapse between seedable cloud systems. <br />A set of suspension criteria that satisfies local concerns <br />would be developed for this program prior to its initiation. <br />These suspension criteria would be incorporated into the evaluation <br />procedure to account for suitable but unseeded or undeclared <br />weather events. It is anticipated that during an average winter <br />condition about three to four events would occur that would cause <br />seeding operations to be suspended. The suspension criteria should <br />incorporate as a minimum the following potential concerns: <br />(1) Potential springtime flooding from the runoff from <br />substantially above-normal snowpacks <br />(2) Potential avalanche hazards <br />(3) Unusually heavy snowfall or snowpack situations. <br /> <br />-31- <br />
The URL can be used to link to this page
Your browser does not support the video tag.