My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00377
CWCB
>
Weather Modification
>
DayForward
>
WMOD00377
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:37:07 PM
Creation date
4/16/2008 10:29:18 AM
Metadata
Fields
Template:
Weather Modification
Contract/Permit #
14-06-D-5640
Project Name
Park Range Atmospheric Water Resources Program
Title
Park Range Atmospheric Water Resources Program - Phase II - Part A
Date
11/15/1966
Weather Modification - Doc Type
Report
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I, <br /> <br />1159 when the first weak signal from the second pulse was found near the Oak <br />Creek Junction. There was essentially no signal for at least 20 minutes be- <br />tween the pulses. The silver iodide generator was left operating continuous- <br /> <br />I <br /> <br />I <br /> <br />1y from 1140 to 1313 and at 1247 at eleven thousand feet a six mile width <br />plume was measured at a distance of fourteen nautical miles. The plume <br />from the first pulse was much wider at closer distances to the release site <br />than the second pulse. <br /> <br />I <br /> <br />I <br /> <br />NUCLEI GENERATOR DAT A <br /> <br />I <br /> <br />Silver iodide particle s we re generated at the Emerald Mountain site <br />by modified hi-output Skyfire-type2 generators on a one cycle/hour schedule, <br />The generators,. on location, are shown in Figure 54. They are nominally <br />ope rated at a flow rate of 1. 2 gal/hr of 4% AgI-NaI- acetone solution and 10- <br />12 psi of propane. This is equivalent to 0.04 g AgI/sec. Two of the four <br />units used were calibrated at Colorado State University. The results are <br />given in Figure 55. <br /> <br />I <br /> <br />I <br /> <br />(I <br /> <br />I <br /> <br />Table X gives a synopsis of the generator operations and Table XI a <br />complete history of generator operating times. There were very few mal- <br />functions; the most frequent one (which was not really a malfunction) was the <br />loss of propane pressure due to an empty tank, and this was easily remedied. <br />Near the end of the season, a flow meter was connected to the generators <br />and it verified the average flow rate shown in Table X. The flow was found <br />to be extremely dependent upon the nozzle setting--a slight adjustment would <br />change the flow by 50-80%. Flow meters will be used during the coming sea- <br />son to regulate the gene rator output. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />The logistics of supporting these generators is a problem. In the <br />winte r, the site can only be reached by a half- hour trip in an over-the- snow <br /> <br />I <br /> <br />I <br /> <br />2 <br />Fuquay, D. M., 1962: Project Skyfire Project Report, 1958-1960, Res. <br />Pap #71, IFR & ES, Ogden, Utah <br /> <br />I <br /> <br />I <br /> <br />- 91 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.