My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00376
CWCB
>
Weather Modification
>
DayForward
>
WMOD00376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:36:59 PM
Creation date
4/16/2008 10:28:52 AM
Metadata
Fields
Template:
Weather Modification
Contract/Permit #
14-06-D-5640
Project Name
Park Range Atmospheric Water Resources Program
Title
Park Range Atmospheric Water Resources Program - Phase II - Parts A and B
Date
10/6/1967
Weather Modification - Doc Type
Report
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />LIST OF FIGURES (cont. ) <br /> <br />I <br />I <br /> <br />Figure No. <br /> <br />40 Observed versus Synoptic 10K ft. MSL Wind Direction <br />FY67 Season - Mt. Harris <br /> <br />Observed versus Synoptic 10K ft. MSL Wind Speed <br />FY67 Season - Mt. Harris <br /> <br />43 5 year average 24-hr. precip. for Park Range 700mbwind<240o 89 <br />5 year average 24-hr. precip. for Park Range 700mbwind~240o <br /> <br />Observed Analysis Period Mean Precipitation Rates <br />as a Function of Mean Precipitation-Rate Predicti.on <br />Variable X <br /> <br />45 Modified Nike-Ajax Installation - Mt. Harri.s, March 1967 94 <br /> <br />I <br />I <br /> <br />41 <br /> <br />42 <br /> <br />I <br />I <br />I <br /> <br />44 <br /> <br />46 <br /> <br />I <br /> <br />47 <br />48 <br /> <br />I <br /> <br />49 <br /> <br />I <br /> <br />I <br /> <br />50 <br /> <br />I <br /> <br />5l <br /> <br />I <br />I <br /> <br />52 <br /> <br />53 <br /> <br />I <br />I <br /> <br />I <br /> <br />Departure of Observed from Synoptic 10K ft. MSL <br />Wind Direction FY67 Season, Mt. Harris <br /> <br />Radiosonde Tracking Disk on Target Tracking Radar <br />Antenna Pede stal - March 1967 <br /> <br />3cm Radar Zero Elevation Ground Return - Mt. Harris <br /> <br />PPI Photo #2248 taken 1358 hrs. January 5, 1967 <br />Uniform ground clutter pa.ttern observed for 14 hours <br />AP15 <br /> <br />PPI Photo #3225 taken 0717 hrs. January 25, 1967 <br />East- West Axis Band Information a second band is <br />observed to the south of the Ya.mpa Valley - AP21 <br /> <br />PPI Photos #3267 through #3277 taken 1042 hr s. <br />through 1132 hrs. 25 January 1967. Occurrence <br />of a semi stationary band. Ap..21 <br /> <br />PPI Photos #3280 through 3283 and #3287 and 3290 <br />taken 1142 hrs. through 1157 hrs. and 1217 hrs. <br />through l227 hrs. respectively on 25 Jan. 1967, <br />Cyclic nature of precipitation signal, AP- 21 <br /> <br />Sketch of Vertical Pointing Data Obtained by Douglas, <br />Gunn and Mar shal3 <br /> <br />Sketch of precipitation signal intensity vs. height and <br />time. Drawn from" A" scope picture s of vertical <br />pointing radar at Mt. Harris from 2353 Jus. 29 March <br />1967 through 0027 hrs. 30 March 1967 <br /> <br />- ix - <br /> <br />Page <br /> <br />83 <br /> <br />84 <br /> <br />85 <br /> <br />92 <br /> <br />95 <br /> <br />96 <br /> <br />98 <br /> <br />99 <br /> <br />101 <br /> <br />102 <br /> <br />104 <br /> <br />104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.