Laserfiche WebLink
<br />II. <br /> <br />III. <br /> <br />INDEX <br /> <br />I. INTRODUCTION <br /> <br />SUMMARY OF FIELD ACTIVITIES INCLUDED IN THE <br />WORK PLAN <br /> <br />A. Geotechnical <br /> <br />B. Surveys and Mapping <br /> <br />C. Fish and Wildlife <br /> <br />D. Water Quality <br /> <br />E. Archaeological <br /> <br />F. Historical Sites <br /> <br />G. Recreation <br /> <br />GEOLOGICAL DATA <br /> <br />A. Existing Geological Data <br /> <br />B. Proposed Geotechnical Field Investigations <br /> <br />1. General <br /> <br />2. General Field Operations <br /> <br />a. Geological Mapping <br />t <br /> <br />b. Geophysical Investigation <br /> <br />c. Core Drilling <br /> <br />IV. TOPOGRAPHIC SURVEYS <br /> <br />.. <br /> <br />A. Existing Topographic Data <br /> <br />B. Surveys ~nd Mapping <br /> <br />1. General <br /> <br />2. Topographic Mapping <br /> <br />3. Control Surveys <br /> <br />4. Location of $eismic Traverses <br /> <br />5. Location Surveys for Core Drill Holes <br /> <br />Page 1 <br /> <br />Page 2 <br /> <br />Page 3 <br /> <br />Page 4 <br /> <br />Page 5 <br /> <br />Page 6 <br /> <br />Page 7 <br />