Laserfiche WebLink
<br />II <br />, I <br /> <br />will be deliver-ed in December or January. Initia~ <br />familiarization and testing will take place at thE! <br />Montrose Skywater Office. The generators will <br /> <br />thereafter be operated at a windswept location on <br /> <br />top of the Mesa. <br /> <br />The generators will be cycled many times under winds <br /> <br />ranging from calm to strong and gusty. Windspeed, <br />I <br />direct i on/and temperature wi 11 be moni tared by a <br /> <br />PROBE station at the test site. Generator flame <br /> <br />temperature, sol uti on flow rate and other system <br />status paramett:!rs will be monitored by the generator <br /> <br />system itself and the data will be transmi tted, by <br /> <br />radio, to a microprocessor system at the Montrose <br /> <br />Skywater Office. This system will control and <br /> <br />interrogate the generators. <br /> <br />The goal of the testing is to end the field season <br /> <br />with a reliable! remote-controlled AgI generator <br /> <br />system suitab1 €! for future unattended use in harsh <br /> <br />mountain environments. <br /> <br />10 <br />