My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00297 (2)
CWCB
>
Weather Modification
>
DayForward
>
WMOD00297 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:34:21 PM
Creation date
4/11/2008 3:45:58 PM
Metadata
Fields
Template:
Weather Modification
Project Name
Project Skywater
Title
Project Skywater - Fiscal Years 1975-78 Report
Prepared By
US Department of Interior Bureau of Reclaimation
Date
3/1/1979
Weather Modification - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Contract Summaries <br /> <br />CONTRACTOR: Western Scientific Services, Inc., Fort Collins, <br />Co lor ado <br />CONTRACT NO. 14-06-0-6644 <br />PRINCIPAL INVESTIGATOR: Gerald W. Jones <br />PERIOD: July 1, 1974, to June 30, 1976 <br />FUNDING: FY75 - $284,760 <br />FY76 - $ 53,257 <br />1.Q. - $17,441 <br /> <br />In November 1968, WSSI (Western Scientific Services, Inc.) was <br />awarded a contract for the design, installation, and operation of an <br />extensive instrument and observation network for collection of <br />hydrometeorological data needed for evaluation of the CRBPP cloud <br />seeding research activity. Measurement networks were established <br />after a series of reconnaissance surveys in each of the hydrologic <br />basins included in the project area. Cooperative relationships were <br />established with the Forest Service, U.S. Department of Agriculture, <br />to evaluate potential data collection sites. <br /> <br />The contract objectives were: <br /> <br />(1) To design and procure meteorological instrumentation to <br />record the distribution and variation of precipitation, wind, <br />temperature, and other microphysical data. <br /> <br />(2) To conduct site investigations and install instrumentation at <br />the selected sites. <br /> <br />(3) To operate the data collection network from October 15 to <br />May 15 each winter season. <br /> <br />(4) To operate a portion of the data collection network from May 16 <br />to October 14 to collect data to establish runoff characteristics of <br />selected watersheds in the San Juan Mountains. <br /> <br />(5) To reduce and process the collected data into computer- <br />compatible formats under established data quality check procedures. <br /> <br />(6) To prepare annual comprehensive meteorological data sets <br />containing the processed data collected from the project network <br />and other sources, and produce finalized data sets consisting of a <br />written summary report, magnetic data tapes, and computer print- <br />outs of the tapes. <br /> <br />II-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.