Laserfiche WebLink
<br />5. TECHNOLOGY TRANSFER <br /> <br />The areas of technology transfer for the AARRP included equipment operations and <br />maintenance, dynamic cold cloud seeding principles and experimental studies, warm cloud <br />seeding experimental studies, planning and conducting randomized field research <br />experiments, data collection and processing, cloud modeling studies, scientific data analysis, <br />and experimental evaluation. The transfer of technology to Thai project staff was <br />accomplished through technical assistance provided by Reclamation experts and technical <br />personnel, Reclamation PASA subcontractors, and NASA contractors. <br /> <br />5.1 Technical Assistance by Reclamation Personnel <br /> <br />Reclamation's technical team that worked on the AARRP, the labor effort for each team <br />member, and the primary tasks performed by each team member, are listed in table 5.1. The <br />tasks listed in table 5.1 were performed within the 12 PASA budget categories listed under <br />the heading "Reclamation PASA Direct" in table 4.2. The total labor effort of 3155 days is <br />comprised of 2876 days for the technical team members plus 279 days for nontechnical <br />support. The technical team's labor effort included days during the period when the PASA <br />was suspended, which were covered by NASA contributions. The cost for Reclamation <br />salaries for all labor under the PASA is listed in table 4.1; Reclamation labor costs covered <br />by NASA contributions are listed in table 4.2. <br /> <br />Table 5.1. - Reclamation's technical team for the AARRP. <br /> <br />Person <br /> <br />Days <br /> <br />Tasks <br /> <br />Dr. Bernard Silverman <br /> <br />1030 <br /> <br />Mr. Glenn Cascino <br /> <br />375 <br /> <br />Dr. Arnett Dennis <br />Mr. Dick Eddy <br />Mr. Curt Hartzell <br /> <br />63 <br />74 <br />724 <br /> <br />Mr. Matt Jones <br />Dr. David Johnson <br />Mr. John Lease <br />Mr. Jack McPartland <br />Mr. Jonnie Medina <br />Mr. Ron Miller <br />Dr. Roy Rasmussen <br />Ms. Anne Reynolds <br />Mr. Dave Reynolds <br />Mr. Mark Stieg <br />Dr. Arlin Super <br />Other nontechnical <br />Total days <br /> <br />16 <br />11 <br />6 <br />126 <br />127 <br />112 <br />120 <br />12 <br />28 <br />45 <br />7 <br />279 <br />3155 <br /> <br />Project management and coordination, scientific <br />planning, core training, resident scientific advisor, <br />scientific data analysis and training, modeling, <br />project design, and operations plan <br />Equipment specifications, radar system and radio <br />communications network installations, technical <br />assistance, and training <br />Administrative coordination <br />Administrative coordination <br />Procurements, logistics, contract monitor, data <br />processing and analysis, technical assistance and <br />training, project operations plans <br />Micro V ax specifications <br />Scientific planning <br />Administrative coordination <br />Aircraft instrumentation system <br />Statistical design, core training seminar <br />Computer program modifications <br />Scientific planning, core training seminar <br />Software support <br />Core training seminar <br />Micro Vax systems management training <br />Administrative coordination <br />Clerical, contracts, procurements, reports, etc. <br /> <br />23 <br />