Laserfiche WebLink
<br />LI ST OF TABLES <br /> <br />Table 1: <br /> <br />Participating groups in 1985 field research <br />program and instnJmentation, observational <br />capability, or other service each will supply. <br /> <br />Table 2: Personnel requirements for research support <br />and for operation of field instrumentation. <br /> <br />Table 3: Primary sequence of scans followed by the WPL <br />radiometer, the NCAR C-band radar, and the <br />WPL Ka-band radar. <br /> <br />vi i i <br /> <br />.1 <br /> <br />Page <br /> <br />.' <br />I <br /> <br />4 <br /> <br />21 ~ <br />37 <br /> . <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />,. <br /> <br />II <br /> <br />. <br /> <br />. <br />