Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />SELF-FINANCING PLAN <br /> <br />COLORADO RIVER SYSTEM HYDROPOWER <br /> <br />'. <br /> <br />1981 POWER PRODUCTION <br />(MILLION KILOWATT-HOURS) <br /> <br />COLORADO RIVER STORAGE PROJECT <br /> <br />HOOVER DAM <br /> <br />5,034 <br />4,931 <br />1,727 <br /> <br />PARKER DAVIS PROJECT <br /> <br />11,692 <br /> <br />. PROJECT COSTS MET THROUGH POWER RATE INCREASE <br /> <br />- <br /> ESTIMATED COST APPROXIMATE <br />. . IN 1981 DOLLARS MILL/KWH LEVY <br /> 3-YEAR DESIGN ADAPTATION $29.7 M 5/6 <br /> 5-YEAR DEMONSTRATION $38.8 M 5/8 <br /> ANNUAL OPERATIONS $11 - $15 M * <br /> <br />* SUBSEQUENT BASIN-WIDE OPERATIONS COULD PRODUCE AN ESTIMATED <br />INCREASE OF 1.5 BILLION KILOWATT-HOURS ANNUALLY IN NEW HYDRO- <br />ELECTRIC POWER GENERATION WHICH WOULD ELIMINATE THE NEED FOR <br />THE POWER RATE INCREASE. <br /> <br />