My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP13037
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
WSP13037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 1:54:35 PM
Creation date
4/11/2008 10:49:11 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8280.10
Description
CREST - Colorado River Enhancement Snowpack Test
State
CO
Author
Unknown - Crest members/BOR?
Title
Briefing Document for the Colorado River Enhancement Snowpack Test
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />SELF-FINANCING PLAN <br /> <br />COLORADO RIVER SYSTEM HYDROPOWER <br /> <br />'. <br /> <br />1981 POWER PRODUCTION <br />(MILLION KILOWATT-HOURS) <br /> <br />COLORADO RIVER STORAGE PROJECT <br /> <br />HOOVER DAM <br /> <br />5,034 <br />4,931 <br />1,727 <br /> <br />PARKER DAVIS PROJECT <br /> <br />11,692 <br /> <br />. PROJECT COSTS MET THROUGH POWER RATE INCREASE <br /> <br />- <br /> ESTIMATED COST APPROXIMATE <br />. . IN 1981 DOLLARS MILL/KWH LEVY <br /> 3-YEAR DESIGN ADAPTATION $29.7 M 5/6 <br /> 5-YEAR DEMONSTRATION $38.8 M 5/8 <br /> ANNUAL OPERATIONS $11 - $15 M * <br /> <br />* SUBSEQUENT BASIN-WIDE OPERATIONS COULD PRODUCE AN ESTIMATED <br />INCREASE OF 1.5 BILLION KILOWATT-HOURS ANNUALLY IN NEW HYDRO- <br />ELECTRIC POWER GENERATION WHICH WOULD ELIMINATE THE NEED FOR <br />THE POWER RATE INCREASE. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.