My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP13033
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
WSP13033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 1:54:38 PM
Creation date
4/11/2008 10:26:03 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8280.10
Description
CREST - Colorado River Enhancement Snowpack Test - Precipitation Management Demonstration Program
State
CO
Author
USDOI/BOR
Title
Monthly Progress Report 1992 - 1993
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />Agreement Number 2-AB-30-001110 <br /> <br />Development of a Program Plan for a <br />Precipitation Management Demonstration Activity <br /> <br />November 14 through December 12, 1992 <br /> <br />Two activities were conducted during this period. First, some time was spent <br />internally reviewing the draft program plan and identifying changes or <br />corrections that need to be made in the final draft. Second, a steering <br />committee meeting was held with Colorado River Basin States representatives on <br />December 10 in Las Vegas, Nevada in conjunction with the Colorado River Water <br />Users Association meeting. The purpose of the meeting was to provide <br />Reclamation with comments on the draft program plan. It was our impression <br />that everyone was essentially satisfied with the plan and no major changes or <br />revisions were reqUired. It was generally agreed that the final plan would <br />include two field sites and transferability studies. It was also agreed that <br />Reclamation would provide a copy of the final plan to the participants for <br />review prior to printing. There was discussion on National Environmental <br />Policy Act compliance and how it affects the program, the form the executive <br />summary should take, and adding more information on potential benefits from <br />cloud seeding. The meeting ended with agreement that everyone would provide <br />their comments in writing to Reclamation by January 4, 1993. <br /> <br />Cost Summarv: <br /> Reportina period <br /> Administration 1 staff day $712 <br /> Task 1 5 staff days $3,552 - See Note 1 <br /> Task 3 1 staff day $286 <br /> Task 4 -2 staff days S3.987 - See Note 2 <br /> Total 12 staff days $8,537 <br /> Total to Date <br /> Administration 10 staff days $5,106 <br /> Task 1 147 staff days $115,807 - See Note 1 <br /> Task 3 40 staff days $15,993 <br /> Task 4 10 staff days $5.678 <br /> Total 207 staff days $142,584 <br /> <br />Note 1 - Reporting period includes $312 in contract cost for contractor <br />support personnel. Total includes $17,156 in contract costs. Contractor <br />staff days are not reflected in the staff day totals. <br /> <br />Note 2 - Reporting period includes $747 in travel costs for trip to Las Vegas, <br />Nevada. <br />
The URL can be used to link to this page
Your browser does not support the video tag.