Laserfiche WebLink
<br />.' <br /> <br />e <br /> <br />e <br /> <br />Agreement Number 2-AB-30-001110 <br /> <br />Development of a Program Plan for a <br />Precipitation Management Demonstration Activity <br /> <br />August 16 through September 19, 1992 <br /> <br />Considerable work was done on Task 3 - Environmental Compliance, resulting in <br />a first draft report by the end of the reporting period. The draft is being <br />circulated among all participants in the Environmental Compliance working <br />group, including meteorologists, for review and comment. Individual comments <br />will be incorporated into a new draft during the next reporting period. <br /> <br />Significant progress was also made on the Task 1 - Program Design. Rough <br />drafts have been prepared for most key sections of the Program Design, <br />including appendixes dealing with (1) the experimental site selection process, <br />(2) comparison of precipitation and supercooled liquid water observations <br />between the Grand Mesa and the Wasatch Plateau, and (3) estimation of runoff <br />associated with snowpack enhancement. The organization of the current rough <br />draft of the meteorological program design includes the following sections: <br />IntrOduction, Background, General Approach, Direct Detection Experimental <br />Phase, Statistical/Physical Experimental Phase, and Project Organization and <br />Management. Sections have not yet been drafted for transferability studies or <br />costs and schedules. A reasonably polished first draft of each section should <br />be available for review by the end of the next reporting period. <br /> <br />Cost Summarv: <br /> Reportinq period <br /> Administration 0.0 staff days $0 <br /> Task 1 14.0 staff days $20,560 - See Note <br /> Task 3 13.0 staff days S4.417 <br /> Total 27.0 staff days $24,977 <br /> Total to Date <br /> Administration 7.0 staff days $2,877 <br /> Task 1 90.0 staff days $79,283 - See Note <br /> Task 3 13.0 staff days S4.417 <br /> Total 110.0 staff days $86,577 <br /> <br />Note: Total includes $10,900 in contract cost for contractor support <br />personnel working on the agreement. This is a lump sum billing in the fourth <br />reporting period for activities from the start of agreement through September <br />19, 1992. Contractor staff days are not reflected in the staff day totals. <br />