My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP13030
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
WSP13030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:34:48 PM
Creation date
4/11/2008 10:03:45 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8282.600.10.B
Description
1998 Annual Operating Plan
Basin
Colorado Mainstem
Author
USDOI/BOR
Title
1998 Annual Operating Plan for Colorado River Reservoirs
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />For water year 1998 operations, Blue Mesa Reservoir will be drawn down to at least an <br />elevation of2283 meters (7490 feet) by December 31, 1997, in order to minimize 'icing problems <br />in the Gunnison River. Blue Mesa will continue to be drawn down through April 1998 to a level <br />that will accommodate the current most probable inflow scenario and accomplish the release <br />objectives with minimal power plant bypasses at Crystal. <br /> <br />The minimum release objective of the Aspinall Unit is to meet the delivery requirements of the <br />Uncompahgre Valley Project and to keep a minimum of 8.5 cms (300 cfs) flowing through the <br />Black Canyon of the Gunnison National Monument and to maintain a minimum of 8.5 cms (300 <br />cfs) below the diversion structure at Redlands (at the confluence of the Gunnison and Colorado <br />Rivers) during the summer months. Under all three inflow scenarios, Blue Mesa is expected to <br />fill in the summer of 1998 and flows through the Black Canyon of the Gunnison National <br />Monument are expected to be above the minimum release objective during the summer months. <br />Filling of the reservoir in water year 1998 will ensure that reasonable specific releases required <br />to study the protection and improvement of habitat for endangered fish can be accommodated. <br />The forecasted runoff for the spring of 1998 will be closely monitored to achieve these <br />objectives. To protect both the blue ribbon trout fishery in the Black Canyon and recreation <br />potential, releases during 1998 will be planned to minimize large fluctuations in the daily and <br />monthly flows in the Gunnison River below the Uncompahgre Tunnel Diversion. <br /> <br />Navajo Reservoir <br /> <br />The April through July unregulated inflow into Navajo Reservoir in water year 1997 was <br />1,026 MCM (0.832 MAF) or 123 percent of average. Water year 1997 unregulated inflow was <br />1,530 MCM (1.240 MAF)or 123 percent of average. Navajo Reservoir did not fill in 1997. <br /> <br />Section 7 consultation with the Fish and Wildlife Service on the operation of Navajo Dam <br />continued in 1997 . Water year 1997 was the seventh year of a seven-year study to evaluate <br />alternative operations of Navajo Reservoir to benefit endangered fish. In an attempt to monitor <br />the aquatic impact oflow winter flows on the San Juan River, winter releases were restricted to <br />250 cfs during the November - February period. During the spring large releases of up to 140 <br />cms (5,000 cfs) were made during June and July to coincide with the peak flows of the Animas <br />River. This resulted in peak flows of305 cms (10,800 cfs) at Bluff, Utah. After the completion <br />of the large spring releases, releases were gradually reduced to approximately 17 cms (600 cfs) <br />for the remainder of the year. <br /> <br />In water year 1998, Navajo Reservoir is expected to nearly fill only under the probable <br />maximum inflow scenario. The reservoir should fill above 80 percent of full under the most <br />probable and probable minimum scenarios. Releases from the reservoir will be held near 17 cms <br />(600 cfs) through the fall and winter months and large releases will likely be made in May and <br />June in order to improve the habitat and provide better spawning conditions for endangered fish <br />in the San Juan River. <br /> <br />Septemb<:r 3, 1997 <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.