My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Erie_WCPlan_50%PR
CWCB
>
Water Efficiency Grants
>
Day Forward
>
Erie_WCPlan_50%PR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2011 9:34:04 AM
Creation date
4/9/2008 1:46:49 PM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Planning Grant
Applicant
Town of Erie
Project Name
Town of Erie Water Conservation Plan
Title
50% Progress Report
Date
4/9/2007
County
Weld
Water Efficiency - Doc Type
Interim Reports
Document Relationships
Erie WC Plan2008
(Message)
Path:
\Water Conservation\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Proposed Facilities <br />This section is a qualitative discussion of Erie's planned expansions of existing water <br />facilities and construction of new facilities. <br /> <br />Conservation Goals <br />A draft has been developed identifying Erie's conservation goals and providing an <br />explanation of how the goals were developed. The targeted water savings in Goals # 1, <br />#2, and #3 may change, pending additional analysis. <br /> <br />Conservation Measures and Programs <br />Currently being drafted. <br /> <br />Evaluate/Select Conservation Measures and Programs <br />Currently being drafted. <br /> <br />Integrate Resources and Modify Forecasts <br />Currently being drafted. <br /> <br />Implementation Plan <br />Currently being drafted. <br /> <br />Public Outreach <br />An open house has been scheduled for May 9, 2006. Poster boards will be on display <br />providing information on the Conservation Plan. A staff member will be stationed at <br />each poster board where residents will have an opportunity to provide comments <br />and/or asl( questions. A handout of frequently asl(ed questions (F AQ) will also be <br />provided to the public. Information on how the public may provide comments on the <br />Plan during the 30-day public review process will be included in the F AQ handout. <br /> <br />T:\9228 - Erie\Conservation Plan\Completion Reports\50% Completion Report.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.