My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02215
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:06:29 AM
Creation date
4/8/2008 12:23:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150140
Contractor Name
Toyne, Glenn
Contract Type
Loan
Water District
1
County
Sedgwick
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Date: <br /> <br />Borrower: <br />Principal Amount: <br />Interest Rate: <br />Term of Repayment: <br />Loan Contract No. : <br /> <br />PROMISSORY NOTE <br /> <br />June 1, 2003 <br />Glenn D. Toyne <br />$76,356 <br />2.75% per annum <br />30 years <br />C150140 dated June 1,2003 <br /> <br />Loan Payment: $3,770.80 <br />Payment Initiation Date *: S 4' P f e in. b 'e,.. / J 2 0 t) 3 <br />, <br /> <br />Maturity Date*: S e .d .f-t:' -.h c __ J. ;z () :3 3 <br />, , <br /> <br />* These two fields are filled in after the project has been substantially completed <br /> <br />1. FOR VALUE RECEIVED, the BORROWER promises to pay the Colorado' Water- Conservation <br />Board ("CWCB"), the Principal Amount plus Interest for the Term of Repayment, pursuant to <br />the LOAN CONTRACT. <br /> <br />2. Principal and interest shall be payable in equal Loan Payrt1ents, with the first payment due <br />and payable one year from the date the eWCB determines that the project is_substcinti~lIy <br />complete (Payment Initiation Date), and annually thereafter until all principal, interest, and <br />late charges, if any, have been paid in full, with all such principal, interest, and late charges; <br />required to be paid on or before the Maturity Date. <br /> <br />3. Payments shall be made to the Colorado Water Conservation Board at 1313 Sherman <br />Street, Room 721, Denver, Colorado 80203. <br />. . <br /> <br />4. The CWCB may impose a late charge in the amount of 5% of the annual payment if the <br />CWCB does not receive the annual payment within-15 calendar days of the due date. <br /> <br />5. This Note may be prepaid in whole or in part at any time without premium or penalty. .Any <br />partial prepayment shall not postpone the dUe date of any subsequent payments or change <br />the amount of such payments. <br /> <br />6. All payments received shall be applied first to late charges, if any, next to accrued interest <br />and then to reduce the principal.amount. <br /> <br />7. This Note is issued pursuant to t/:le LOAN CONTRACT between the. CWCB and. the <br />BORROWER. The LOAN CONTRACT creates security interests in favor of theCWCB to secure <br />the prompt payment of all amounts that may become due-hereunder. Said security interests <br />are evidenced by a Deed of Trust of even date and amount and cover certain real prope~, <br />of the BORROWER. The LOAN CONTRACT and Deed of Trust grant additional rights to the <br />CWCB, including the right.to accelerate the maturity of this Note in certain events. <br /> <br />8. If any annual payment is not paid when due or any default under the LOAN CONTRACT or the <br />Deed of Trust securing this Note occurs, the CWCB may declare the entire outstanding <br />principal balance of the Note, all accrued interest, and any outstanding late charges <br /> <br /> <br />Appendix 2 to Loan Contract C150140 <br />
The URL can be used to link to this page
Your browser does not support the video tag.