Laserfiche WebLink
<br />" <br /> <br />~ , <br /> <br />Water Project Construction Loan Program. Project Data Sheet <br /> <br />Borrower: Dblores Water Conservancy <br />District -Water Activity'Enterprise <br />Project Name: WETPACK II <br /> <br />County: Montezuma <br /> <br />Drainage Basin: Dolores <br /> <br />Project Type: Pressurized Irrigation <br /> <br />Water Source: Montezuma Valley Irrigation I <br />Irrigation Company (MVIC) <br />Funding Sources: CWCS, OWCD <br /> <br />Aver. Delivery: 4400 AF <br /> <br />. Total Project Cost: $3,692,000 <br /> <br />Type of Borrower:, Agricultural <br />CWCB STTFPBA,Loan: $3,323,180 <br /> <br />Interest Rate: 2.50% <br /> <br />Term: 30 years <br /> <br />DWCD is applying for a loan to construct pumping plant and pipeline facilities to provide water to <br />irrigate existing dry land, as part of WETPACK 0Nater for Everyone Tomorrow Package.) The new <br />loan would replace the remaining unused amount ($2,931,200) on an existing $5,461,200 (3.5%, 30- <br />year) loan contract approved in 2002. DWCD has incurred cost increases due to drought-related <br />delays. To date, 1500 MVIC Class S Shares providing 6,000 AF/year have been acquired, and. <br />construction on the 440,;,acre Sandstone West irrigation project is in process. The proposed project <br />would irrigate approximately 2;200 acres in the Yellow Jacket East (1 ,011 ac.), and Pleasant View East <br />(1,189 ac.) areas, using approximately 4,400 acre-feet of the MvIC Class B shares. COnstruction at <br />this level would provide irrigation to a total of 2892 acres and utilize 5,780 AF 'of water per year. <br />Construction, will involve pipelines, pumps and related facilities to' deliver water, through the Dove <br />Creek Canal System, under pressure for sprinkler irrigation only. The project will provide the irrigated <br />land with delivery boxes for each 160 acres (or less) providing at least 45 psi of pressure to operate <br />sprinkler systems. In the, Yellow Jacket East area, facilities will include a new pump station along the <br />Dove Creek Canal,approximafely1 0,560 feet of pipe ranging in size from 10 inches to 16 inches, and <br />9 delivery boxes; and in the Pleasant View East area; will consist of a neW pump station, approximately <br />',15,840 feet of pipe ranging in size from 10 inches to 24 inches, and 12 delivery boxes. <br /> <br /> <br />/~ <br />'/:,"~ <br />.;;., <br /> <br />/ <br /> <br />Location Map <br /> <br /> <br />/ <br /> <br />,,' <br /> <br />'! ,., .1-~}: <br />. , <br />../ <br /> <br />". ~;" ..- ." .- .....~.<''' <br />-;'.<i wr__ <br />, <br />! <br />. <br />! <br />l' '.. <br /> <br />.,~," <br />