My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02219
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2011 3:14:55 PM
Creation date
4/8/2008 12:23:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150116
Contractor Name
B.F. & M.E. Porter, LLLP
Contract Type
Loan
Water District
45
County
Garfield
Bill Number
SPL
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PORTf.R LAND AND CATTLE CO:\IPMY <br />BARTO:'oi PORTf.R RESf.RVOIR REIIABILlTATIO:\ <br /> <br /> <br />Eastllam <br /> <br />PrOjN'f J)pl\C'riptinn <br /> <br />This $2,000,000 project involves enlarging the existing reservoir to an approximate capacity <br />of 1,1 00 acre-feet. The existing Class 3 reservoir was constructed in 1958 with a dam height of 43- <br />feet impounding a reservoir of 206 acre-feet. This project involved raising the cast dam to a <br />height of 69 fect and removing the west dam and replacing it with a new 83.S-feet high darn. A <br />new spillway and outlet structure were constructed and the inlet ditch was relocated to a higher <br />elevation to gravity feed the reservoir. Project commenced construction in spring of2001 and was <br />completed in the fall of2003. <br /> <br />Projpf'f nata <br /> <br />Sponsor: Porter Cattle Co. COllOt)': Garfield 'Vater Source: Garfield/S. Canyon/3-milc Creeks <br /> <br />Terms of Loan: S 1 ,000,OOO@2.50% for 20-yrs. Suhslantial Completion Date: January 1,2004 <br /> <br />Dcsi~n Engineer: Golder and Associates. Inc. - Denver, Colorado <br /> <br />Construction Contractor: Porter Land and Cattle Company - New Caslle. Colorado <br /> <br />Design/Construction F:lements: East Darn: Ht. = 69-ft. Len!:,rth = 840-ft. Crest = 25-ft wide <br />West Darn: HI. = 83.5-fi. Length = 790-fi. Crest = 25-fi. wide <br />Class I Intermediate Facility, Storage Capacity = 1,100 AF <br />460,000 Cuhie Yards of Earthwork, Spillway = 75% PMF <br /> <br />Annual Amount of\\'ater Delivered = 1.100 Acre-Feet Stora~e <br />
The URL can be used to link to this page
Your browser does not support the video tag.