My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02207
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:19 AM
Creation date
4/8/2008 12:13:22 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0078FX
Contractor Name
Blue Lake Owners Association
Water District
0
County
Eagle
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />11/24/03 MON 11:35 FAX <br /> <br />t <br /> <br />RECEIVED FE a 8 1992 <br /> <br />RCE <br /> <br />RESOURCE CONSULTANTS & ENGINEERS, INC. <br />A KLH Engineering Group Company <br /> <br />February 6, 1992 <br /> <br />Mr. Dick Rosecrans <br />Crystal lakes Water and <br />Sewer Association <br />P.O. Box 158 <br />Red Feather lakes, Colorado 80545 <br /> <br />RE: Proposed Upper Lone Pine Lake <br /> <br />Dear Dick: <br /> <br />Enclosed please find our bUling for the feasibility study of the proposed Upper Lone Pine lake. This <br />last month we have worked on most tasks of the study. The following is a summary of the work completed <br />on each of the tasks: <br /> <br />Task 1: Data Collection (45% comDlete). We have completed most of the work for describing <br />CLWSA. We have not started work on RFSIC since we are st~1 gathering information about them. <br /> <br />Task 2: Water Demands 1100% comDletel. We have completed most of the work on this task. We <br />utilized the augmentation plan to develop CLWSA's demands, developed RFSIC demands based on the <br />amount of water required to fill each reservoir in the spring, and developed the domestic water demands <br />for the Red Feather Lakes area for the proposed water district <br /> <br />Task 3: . Hvdroloqv and Water RiQhts (100% comDlete). We have developed an estimate of the <br />virgin flows of the basin, investigated the water rights of the basin and have made an estimate of the <br />allowable divertable water for the reservoir. In addition, we have developed the 100-year and probable <br />maximum precipitation flood events for the basin. <br /> <br />Task 4: Water Quality (100% comDlete). Water samples of the stream have been collected and <br />have been analyzed in the laboratory. . <br /> <br />Task 5: Field Investigations (90% comDfete). All field investigations have been completed and we <br />are in the process of documenting the previous work completed. . <br /> <br />Task 6: Preliminary Environmental Assessment (100% comPlete). Most ofthe work on this task is <br />complete, and a draft report has been written. Comments received from Mr. Krassa have been Incorporated <br />in the environmental assessment section. <br /> <br />3665 JFK Parkway, Building 2, Suite 300 · P.O. Box Q . Fort Collins, CO 80522 <br />(303) 223-5556 · Denver Metro (303) 572-1806 . FAX (303) 223-5578 <br />Fort Collins, CO . Davis, CA · Laramie, WY <br /> <br />!gJ 006 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.