My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02199
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:45 AM
Creation date
4/8/2008 11:31:44 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153506
Contractor Name
Huerfano-Cucharas Irrigation Company
Water District
0
County
Las Animas
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />- <br /> <br />STA TE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />MEMORANDUM <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />TO: File <br /> <br />John Van Sciver, P.E. -:::f7AJV <br />Water Supply Planning and Finance Section. <br /> <br />FROM: <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />DATE: July 7,2003 <br /> <br />SUBJECT: Huerfano Cucharas Irrigation Company <br />Feasibility Study Loan <br />Contract #C153506, dated November 11, 1987 <br /> <br />In 1998 I spoke to Keith Ferguson, PE, of G.E.1. Consultants, who performed this feasibility study. The <br />purpose of the study was to evaluate alternatives for rehabilitation of the Cucharas #5 Reservoir dam, <br />located east of Walsenburg. The reservoir has been under restriction by the State Engineer since the <br />1880's, due to problems of excessive seepage, embankment settlement, cracking of the upstream <br />slope concrete, and inadequate spillway size. <br /> <br />Keith said the Company terminated the study before it was completed, at a point when $11,400 of the <br />$19,000 total loan amount had been expended. This was done because all preliminary cost estimates <br />to repair the dam exceeded the Company's ability to pay, and because no grant funding could be <br />identified for the project. <br /> <br />As of this date (July 7,2003) the project to rehabilitate the Cucharas #5 Reservoir dam has never been <br />completed, and the reservoir remains under restriction by the State Engineer. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.