My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ02194
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ02194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:44 AM
Creation date
4/8/2008 10:23:01 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153477
Contractor Name
Victor, City of
Water District
0
County
Teller
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br /> <br />1313 Shennan Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />MEMORANDUM <br /> <br />To: <br /> <br />From: <br /> <br />Contract Files <br /> <br />S. S. Biondo, Conttact Compliance o~ <br />July 8, 2003 <br /> <br />Date: <br /> <br />Subject: <br /> <br />City of Victor <br />C153477 Project Closed <br /> <br />Purpose: <br />initiation. <br /> <br />To determine applicability of the repayment clause relative to a to-year project <br /> <br />Data: <br /> <br />1. A Feasibility Report Contract was consummated with the City of Victor on <br />October 1, 1986, for $22,500.00. <br />2. The Feasibility Study was completed March 2, 1987. <br />3. The 10-year clause for the project to be built expired October 15, 1996. <br />4. The City of Victor re-submitted another Feasibility Study April 15, 1995 to <br />rehab Victor Dam No.2. <br />5. A loan in the amount of $600,000 was authorized by HB 95-1155. <br />6. The contract was consummated August 1, 2001, by CWCB and the City of <br />Victor. <br />7. The project began in September 2001. <br />8. The project had not been built during the initial10-year period. <br /> <br />Conclusion: Feasibility Report Contract No. C153477 is closed and repayment will not be <br />required since the project had not been built prior to 1996. This exceeds the agreement provisions <br />and is not enforceable. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.