My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP13016
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
WSP13016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:34:41 PM
Creation date
4/3/2008 11:02:22 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8282.600.10.B
Description
2000 Annual Operating Plan
Basin
Colorado Mainstem
Author
USDOI/BOR
Title
29th Annual Report and 2000 Annual Operating Plan for Colorado Riber System Reservoirs
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Blue Mesa, Morrow Point, and Crystal Reservoirs (Aspinall Unit) <br /> <br />In water year 1999, the April through July unregulated runoff into Blue Mesa Reservoir was <br />834 MCM (0.676 MAF), or 97 percent of average. Water year 1999 unregulated inflow was <br />1,293 MCM (1.048 MAF), or 108 percent of average. Water year 1999 powerplant bypasses <br />were approximately 232 MCM (0.188 MAF) at Crystal, the result of annual system maintenance <br />and spring runoff exceeding powerplant capacity. Releases and spills up to 109 cms (3,840 cfs) <br />occurred at Crystal with flows in the river below the Gunnison Tunnel in excess of85 ems (2,900 <br />cfs). Blue Mesa nearly filled in water year 1999, reaching a peak elevation of2291.96 meters <br />(7,519.21 feet) on July 31, 1999. <br /> <br />Section 7 consultation with the Fish and Wildlife Service on the operation of the Aspinall Unit <br />continued in 1999. A 5 year effort to study the effect of various release patterns on habitat, <br />reproductive success, and reintroduction of endangered fish in the Gunnison River was completed <br />in 1998. The Fish and Wildlife Service is expected to issue a draft biological opinion on the <br />operation of the Aspinall Unit in 2000. Additionally, negotiations between Reclamation, the <br />National Park Service, and the State of Colorado to develop a contract to deliver water from the <br />Aspinall Unit to the Black Canyon of the Gunnison National Monument, in recognition of the <br />reserved right for the monument, are expected to continue. <br /> <br />For water year 2000 operations, Blue Mesa Reservoir will be drawn down to at least an elevation <br />of2,283 meters (7490 feet) by December 31, 1999, in order to minimize icing problems in the <br />Gunnison River. Blue Mesa will continue to be drawn down through April 2000 to a level that <br />will accommodate the current most probable inflow scenario and accomplish the release <br />objectives with minimal powerplant bypasses at Crystal. <br /> <br />()O~ <br />1,., , <br />V <br /> <br />~ <br /> <br />b1v <br /> <br />The minimum release objectives of the Aspinall Unit are to meet the delivery requirements of the <br />Uncompahgre Valley Project, to keep a minimum of8.5 cms (300 cfs) flowing through the Black <br />Canyon of the Gunnison National Monument, and to maintain a minimum of8.5 cms (300 cfs) <br />below the diversion structure at Redlands (at the confluence of the Gunnison and Colorado <br />Rivers) during the summer months. Under all three inflow scenarios, Blue Mesa is expected to_~ <br />fill in the summer of 2000 and flows through the Black Canyon of the Gunnison National A. <br />Monument are expected to be above the minimum release objective during the summer months. ,,~ <br />Filling of the reservoir in water year 2000 will ensure that reasonable specific releases required <br />to study the protection and improvement of habitat for endangered fish can be accommodated. <br />The forecasted runofffor the spring of2000 will be closely monitored to achieve these objectives. <br />To protect both the blue ribbon trout fishery in the Black Canyon and recreation potential, <br />releases during 2000 will be planned to minimize large fluctuations in the daily and monthly flows <br />in the Gunnison River below the Gunnison Tunnel diversion. <br /> <br />Navajo Reservoir <br /> <br />The San Juan River basin experienced a very dry winter, and in early April, inflow forecasts were <br />calling for April through July inflow to be only 49 percent of average. April and May, however, <br />turned out to be months with abundant precipitation in the San Juan Basin. April through July <br /> <br />December 1, 1999 <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.