Laserfiche WebLink
Eackgt•ound <br />The District is located approximately 11 miles east of Estes Park and encompasses approximately 700 <br />acres. The District provides water to 268 taps (266 households and 2 businesses) with a projected total <br />of 350 taps at planned build out, estimated to occur by 2015. The District draws surface water from the <br />Little Thompson River and processes this water for domestic consumption with amicro-filtration plant. <br />The District has been severely impacted by water shortages during the past several years. During the <br />summers of 2000 through 2002 the Little Thompson River, the District's primary source of water, ran <br />dry at times, due to the severe drought conditions. Given the persistent nature of drought over the past <br />few years, the District concluded that the Little Thompson River cannot be considered a reliable and <br />continuous supply of raw water. <br />Based on that conclusion the District hired the services of McLaughlin Water Engineers to prepare a <br />planning document study to evaluate the needs of the District's existing water system. The Study <br />identified the following needs: <br />Construct a raw water storage facility to be utilized when the river cannot meet <br />demands and to secure a reliable water source. <br />Address ongoing distribution line problems. <br />Increase capacity of the District's 36 gpm water treatment rate to 50 gpm needed to <br />accommodate full build-out. <br />Address impacts of the Bull Creek fire on their treatment gallery. <br />Based on the recommendations of the study, the District, by election, was approved to incur debt up to <br />$3,000,000, for the purposes of financing the improvements identified above. To-date, the District has <br />acquired four loans to complete various improvements to its system; a 1998 General Bond with an <br />outstanding balance of $250,000, tvvo loans with Colorado Water Resources and Povoer Development <br />Authority (CWR&PDA) with a combined outstanding balance of $821,998, and a $2,054,189 loan from <br />CWCB. The requested $757,500 loan increase from the CWCB, combined with the existing loans, will <br />place the District's outstanding debt at $3,883,687. The District has the ability to increase its debt <br />service to $3,890,000, based on its 2007 assessed evaluation of $7,788,810. The District is scheduled to <br />hold an election in May of 2008 to increase its debt service to $3,890,000. <br />In June 2004, the District provided a feasibility report to the CWCB, prepared by McLaughlin Water <br />Engineers that assessed the water supply alternatives to meet current and future needs of the District. <br />Table 1 below is a brief summary of the major project elements presented in the original feasibility study, <br />compared with the projected final construction costs. <br />2 <br />Flood Protection • Water Project Planning and Financing • Stream and Lake Protection <br />Water Supply Protection • Conservation Plaxu~ing <br />