My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18c
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
18c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:36:27 PM
Creation date
4/1/2008 8:44:21 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/18/2008
Description
CF Section - New Project Loans - Supply Irrigating Ditch Company - Knouth Reservoir Dam Rehabilitation
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Project Loan Program -Project Data <br />Borrower: Supply Irrigating Ditch Company <br />Project Name: Knouth Reservoir Dam <br />Rehabilitation <br />County: Boulder <br />Project Type: Reservoir Rehabilitation <br />Drainage Basin: South Platte <br />Total Project Cost: $995,000 <br />Type of Borrower: Blended (Ag., Municipal <br />High Income, Commercial) <br />CWCB Loan: $904,960 (Including 1%fee) <br />Water Source: St. Vrain Creek <br />Funding Sources: CWCB, Company <br />Aver. Diversion: 4,800 acre-feet <br />Interest Rate: 2.60% Term: 30 years <br />Supply Irrigating Ditch Company services approximately 8,500 acres of irrigated farmland in <br />Boulder County between Lyons and Mead. Currently the water for irrigation is supplied by a direct <br />flow decree and from the Bea~~er Park Reservoir (which is approx. 25 miles west of the start of the <br />Supply Ditch near the continental divide). Supply Irrigating Ditch Company is in the process of <br />acquiring a storage decree within Knouth Reservoir in exchange for the rehabilitation of the <br />reservoir. This reservoir will give the Company some system flexibility, as this storage is <br />significantly closer to users than Beaver Park Reservoir. The reservoir improvements include: <br />construction of a spillway, removing vegetation from the embankment of the dam, lining select areas <br />on the upstream dam face with a clay liner, placing riprap along the upstream dam face, enclosing an <br />irrigation ditch within a pipe, and installing dam instrumentation. <br /> <br /> <br />'~ <br />~^ <br />~', Knouth Reservoir <br />, <br />~ <br />~" <br />~ <br />~ <br />M <br />~ <br />IARIMi-M CO ~ ~ <br />-..._ <br />y <br />_- _ _-. <br />,- T.,. <br />-„C"-~:. ~ ~--- __ _ - <br />~ BOC-DFA CO .. ~ i, <br /> ' <br /> <br />\ S u.x~ <br />~ <br />~ ~ r.. wb.. <br /> <br />+ <br />w <br />~ <br />t.. ,, <br />~ <br />~Ydn ~~~ .~ , <br />. __ ___.. <br />~ /~~ ~ <br />1 .. . <br />latr <br />N <br />- ' <br /> I <br />i" ~ <br /> <br />~ <br />~ ~ - <br />~ <br />~ ~ ~ ~ <br />w. ~ <br />, <br />}~ <br /> .M,. 1- <br /> <br />ti, ~ <br />1 <br />a4 ~ ~ ~ ~ ~~ <br />. \ .:. 1 <br /> r'~l. <br /> <br /> <br />i~R". tiv,n: <br />- -- S ~ <br />~ <br />~~.~ <br />~~:~. <br />,,. 1 , <br />; <br />~~ \ , <br />Location Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.