Laserfiche WebLink
Supply Irrigating Ditch Company - Knouth Reservoir <br />March 11, 2D08 <br />Page 3 of 5 <br />Project Description <br />Agenda Item 18c <br />The purpose of this project is to enhance the means for the Company to continue providing irrigation <br />water to shareholders by adding another storage option. This will be achieved through the <br />rehabilitation of the Reservoir to its original capacity. Three alternatives were considered: <br />1. The no-action alternative. <br />2. Rehabilitation of the entire dam and all appurtenant structures. <br />3. Rehabilitation of areas of dam that have seepage problems. <br />Alternative No. 1 No action was considered unacceptable because if the dam improvements are not <br />completed the SEO could require the breach of the dam. This would eliminate this Reservoir site as <br />a storage option; therefore not achieving the project goal. <br />Altef°native No. 2- Rehabilitating the entire dam was ruled out because the scale of the project and <br />associated costs were greater than necessary (when compared to Alt. 3) to achieve the goal of <br />restoring the reservoir to its original capacity. This option involved reshaping the upstream face of <br />the dam, removing the existing outlets, constructing a new box culvert inlet and improving a section <br />of the Supply Ditch. <br />Alternative No. 3 Rehabilitation of seepage areas of dam and improvements to supply ditch was <br />the selected alternative because it is the most cost effective way to repair the dam so the Company <br />can use the Reservoir for storage. <br />The selected alternative, Alternative No. 3, includes construction of a spillway, removing vegetation <br />from the embankment of the dam, lining select areas on the upstream dam face with a clay liner, <br />placing riprap along the upstream dam face, enclosing an irrigation ditch within a pipe, and installing <br />dam instrumentation. <br />URS has begun preparation of engineering design and cost estimates for the project. The design is <br />scheduled to be completed and submitted to the SEO for approval in May 2008. Pending SEO <br />approval of the plans, construction is expected to begin in the fall of 2008. <br />Project Cost Estimate <br />Engineering Design <br />Construction Engineering <br />Construction <br />$64,000 <br />$65,000 <br />$866,000 <br />Total $995,000 <br />Financial Analysis <br />Table 1 shows a summary of the financial aspects of the loan request. The Company shareholders <br />are a mix of agricultural, commercial and municipal owners; therefore the interest rate was <br />determined on a weighted basis based on share ownership (per the CWCB Financial policy #7). <br />