My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01742
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC01742
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2011 2:54:11 PM
Creation date
3/31/2008 3:08:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150165
Contractor Name
Lower Platte and Beaver Canal Company
Contract Type
Loan
Water District
1
County
Morgan
Loan Projects - Doc Type
Project Completion Letter
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PROMISSORY NOTE <br /> <br />Date: February 1, 2004 <br />Borrower: The Lower Platte and Beaver Canal Co. <br />Principal Amount: $ 313,605.00 <br />Interest Rate: 2.5% per annum <br />Term of Repayment: 30 years <br /> <br />Loan Contract No.: <br /> <br />Loan Payment: <br /> <br />Payment Initiation Date*: <br /> <br />Maturity Date*: <br /> <br />* Payment Initiation Date <br />substantially completed. <br /> <br />1. FOR VALUE RECEIVED, the BORROWER promises to pay the Colorado Water Conservation Board <br />("CWCB"), the Principal Amount plus Interest for the Term of Repayment, pursuant to the LOAN <br />CONTRACT and this promissory note. <br /> <br />C150165, dated <br />$14,983.31 <br />APr; I /. ZCJ() 1 <br />, , . <br /> <br />14,t:Jr; I I J 'L C 31' <br />and Maturity Date fields are filled in after the project has been <br /> <br />2. Principal and interest shall be payable in equal Loan Payments, with the first payment due and <br />payable one year from Payment Initiation Date (the date the CWCB determines that the project <br />is substantially complete), and annually thereafter. All principal, interest, and late charges, if <br />any, then remaining unpaid shall be due and payable on or before the Maturity Date. <br /> <br />3. Payments shall be made to the Colorado Water Conservation Board at 1313 Sherman Street, <br />Room 721, Denver, Colorado 80203. <br /> <br />4. The CWCB may impose a late charge in the amount of 5% of the annual payment if the CWCB <br />does not receive the annual payment within 15 calendar days of the due date. <br /> <br />5. This Note may be prepaid in whole or in part at any time without premium or penalty. Any <br />partial prepayment shall not postpone the due date of any subsequent payments or change the <br />amount of such payments. <br /> <br />6. All payments received shall be applied first to late charges, if any, next to accrued interest and <br />then to reduce the principal amount. <br /> <br />7. This Note is issued pursuant to the LOAN CONTRACT between the CWCB and the BORROWER. <br />The LOAN CONTRACT creates security interests in favor of the CWCB to secure the prompt <br />payment of all amounts that may become due hereunder. Said security interests are evidenced <br />by a Security Agreement and Deed of Trust ("Security Instruments") of even date and amount <br />and cover certain revenues, real property, water rights and/or accounts of the BORROWER. The <br />LOAN CONTRACT and Security Instruments grant additional rights to the CWCB, including the <br />right to accelerate the maturity of this Note in certain events. <br /> <br />Appendix 2 to Loan Contract C150165 <br />
The URL can be used to link to this page
Your browser does not support the video tag.