My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01742
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC01742
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2011 2:54:11 PM
Creation date
3/31/2008 3:08:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150165
Contractor Name
Lower Platte and Beaver Canal Company
Contract Type
Loan
Water District
1
County
Morgan
Loan Projects - Doc Type
Project Completion Letter
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />May 3, 2007 <br /> <br />Bill Ritter Jr. <br />Governor <br /> <br />NOTICE OF PROJECT SUBSTANTIAL COMPLETION AND REPAYMENT <br /> <br />Harris D. Sherman <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Mr. Robert Tuck, President <br />Lower Platte and Beaver Canal Company <br />P.O. Box 190 <br />Hillrose, CO 80733-190 <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Re: Contract Nwnber C150 165 - AugmentationlRecharge Project <br /> <br />Dear Mr. Tuck: <br /> <br />This letter is to advise you that the work described in the above referenced Contract was substantially completed as of <br />April 1, 2007. <br /> <br />In accordance with the Contract, the Lower Platte and Beaver Canal Company owes $12,085.36 for interest during <br />construction, as calculated on the attached spreadsheet, due by May 28, 2007. Please make your check for interest during <br />construction payable to the Colorado Water Conservation Board and include the Contract Number on the check. <br /> <br />As outlined in the Promissory Note, Appendix 2 of the Contract, your fIrst loan payment in the amount of$14,983.31 is <br />due on April 1 , 2008. A 1% loan service fee of $3,105.00 has been added to your principal balance for a fInal loan balance of <br />$313,605.00. Please see the attached Loan Repayment Schedule and copy of the Promissory Note. <br /> <br />In accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A.16, please note that the <br />renewed insurance certifIcates need to be provided to the Colorado Water Conservation Board annually. <br /> <br />It has been a pleasure of the Colorado Water Conservation Board to work with the Lower Platte and Beaver Canal <br />Company on the successful completion of this project. Please call if you have any questions regarding this matter or if we can be <br />of service to you in the future. <br /> <br />;;}6J~ <br />MZ:::,:E. <br /> <br />Chief, Water Supply Planning and Finance Section <br /> <br />cc. Eric Wilkinson, CWCB Board Member <br />Water Supply Planning and Finance Section <br />Project file <br />Contract file <br /> <br />Contract Amount <br />Expended Amount <br /> <br />= $313,605.00 <br />= $313,605.00 <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.