Laserfiche WebLink
<br /> <br /> <br />Cadiz 5O-Year Storage and <br />Conjunctive Use Program <br />. Minimum transfer of 1.1 mlllionacre- <br />feet of Indigenous groundwater <br />. Maximum transfer of up to 2 million <br />acre-feet of indigenous groundwater <br />. 1.0 million acre-feet of CAW storage <br />at 8ny one time <br />. 150,000 8c,.,eetlyear put capactty <br />. 150,000 acr.feetJyear take capactty <br /> <br /> <br />Hayfield Valley Program <br />Proposed Facilities <br />. Spreading Basins 56.500,000 <br />. CoUectlon Pipeline 14,000,000 <br />. EdracUon Welts $24,000,000 <br />. Power, Te5emetry ~ <br />Subtotal 136.000.000 <br /> <br />. LandlConIlngencle. <br />Totel <br /> <br />lllJ!lIllJIlIll <br />"7"""" <br /> <br />Cadiz Storage and Conjunctive <br />Use Program <br /> <br />. November 1198 - UWD Boefd .,lhorizect pilot <br />~nsb'aUon progrlm and EIMIS <br />.......tlon <br /> <br />. ~. October '999 - PI10I demonelnltlon <br />-- <br /> <br />. November 1999 - AetNaed Dre" E1Mts <br />. Ilerch.'AprlI2000. 80wd certIflc8llon.. BLU <br />ReconI of DecIsion <br />. Spring 2001 . Complete c:onWUction of <br />convey.nee and .,udlng hlcnltles <br /> <br />Cadiz Program <br />Proposed Facilities <br /> <br />. Cadiz Pumping Plant <br />. Conveyance/Power <br />. Spreading Basins <br />. Wellfleld <br />. LandlMltigation <br />. Eng'glLegallAdmin <br />Total Prolect Cost <br /> <br />$11.113.000 <br />$86.358,000 <br />$3.513.000 <br />$30,672,000 <br />$2,204,000 <br />I1MllillllI <br />$149.744,000 <br /> <br />6 <br />