<br />O~J.3"- <br />'i.J Li . --- <br /> <br />price. However, the long-run marginal cost of peaking power <br />implicit in the Interim Report's calculations is 203 mills/kwh <br />(composite rate) with fuel price escalation, or 190 mills without <br />fuel price escalation. There is reasonable do~bt that peaking <br />power demand would grow at the 5 percent rate ?rojected by the <br />utilities if ?eaking power were to be priced at this estimated <br />long-run marginal cost. In fact, it is not unreasonable to <br />suppose that peaking power demand might grow very little, if at <br />all, if such very large rate increases were to occur. <br /> <br />While ~tilities in this area do not now price power, and <br />particularly pea~ing power, at its long-run marginal cost, there <br />are still indications that future power ?ricing will move in this <br />direction due to the influence of the buy-back provisions of <br />PURPA and t~e general trend of regulatory authorities (including <br />the Colorado PUC) to strive for rates which reflect real marginal <br />costs. But even if this change does not occur, and the peaking <br />power load growth necessary to justify a Cache la poudre peaking <br />plant is realized, it would then be improper to calculate <br />beneEits at the 203 mill rate when the power produced is, in <br />fact, marketed at a lower rate. This would constitute a <br />violation of the willingness to pay principle of benefit <br />estimatio!1. <br /> <br />The problem of uncertainty about future peaking power demand <br />and price is so great and so fundamental to the evaluation of the <br />Cache la poudre proje~t alternatives that it deserves special <br />attention in Phase II through a "break-even" analysis. This <br />ap?roach will highlight the uncertainties involved and their <br />possible consequences, will provide a way of dealing adequately <br />with that uncertainty, and will minimize -the additional work <br />required in Phase II. <br /> <br />The purpose of this break-even analysis for hydropo~er <br />benefits (peaking ?Ower only) is to estimate the minimum peaking <br />power value (ex?ressed as a comoosite of energy and caoacity <br />values) which wo~ld be required to make the power benefits just <br />equal to the seoerable costs for hydropcwer in alternatives 2 and <br />7. <br /> <br />Hydropower Benefits (Non-Peaking). Run-of-river hydropower <br />benefits will be estimated using unit values developed in Phase I <br />of the study with an average plant factor for the four <br />alternatives. This single value shall be considered a <br />representative value for run-of-river hydropower for all four <br />alternatives. <br /> <br />M&I Benefits. The City of Fort Collins may satisfy its <br />future water needs ~y b~ilding a new storage project to make <br />water rights it now owns or may acquire usable. M&I benefits <br />shall ~e estimated as the cost of the proposed ~ew Fort Collins <br />storage oroject (for 10,000 acre-feet of municipal storage). <br /> <br />-4- <br />