Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />----- <br /> <br />Table 2.1 <br /> <br />Project Forecast 2040 Demand and Design Capacity by Service Area <br /> <br />Location <br /> <br />SJR Diversion <br />ac~ftIyr <br />7,500 <br /> <br />1,200 <br /> <br />SJR Depletion <br />ac~ftlyr <br />7,500 <br /> <br />1,200 <br /> <br />City of Gallup, NM <br /> <br />JicarilJa Apache Nation <br />Navajo Nation, New Mexico <br />Central Area <br /> <br />834 <br /> <br />834 <br />2,473 <br />4,316 <br />864 <br />2,118 <br />5,368 <br />2,240 <br />1,871 <br />700 <br />6,411 <br />27,193 <br />35,893 <br /> <br />Crownpoinl <br />Gallup Area <br />Huerfano <br /> <br />2,473 <br />4,316 <br />864 <br />2,118 <br />5,366 <br />2,240 <br />3.742 <br />700 <br />6,411 <br />29,064 <br />37,764 <br /> <br />Rock Springs <br />Route 491 <br /> <br />T orreon <br />San Juan River <br />NAPI industrial uses <br /> <br />Navajo Nation, Arizona (Window Rock area) <br />T olal Navajo Nation <br />Project Total <br /> <br />water balance purposes. no relurn flow 10 the San Juan River from these other locations is <br />expected or accoumed. RClUrn flow to lhe Rio Grande or Lillie Colorado rivers is highly <br />unlikely, even though there will be discharge 10 the groundwater in these areas. Local <br />groundwater storage space logether with local pumping will limit the pOlenlial for surface <br />discharge. Even if surface discharge docs occur, Ihe dislance 10 Ihe Rio Grande or Little <br />Colorado rivers is so great thai il is unlikely Ihat relum flow would reach Ihese rivers. <br /> <br />Deliveries Iypically vary depending on changes in demand with the largest demand in summer <br />monlhs. The Shiprock waler delivery patlern for March 1992 through February 1993, shown in <br />Table 2.2, was used 10 dClennine average monthly deliveries. Return flows were assumed to <br />follow the same distribulion. <br /> <br />BIOLOGICAL ASSESSMENT <br />NAVAJO GALLUP WATER SUPPLY PROJECT <br />September 3. 2004 <br /> <br />Page 4 <br />